Service 07 of 07

One exchange replaces a mesh of links.
Each line tested first.

One named supplier per interface, a contract test on every line, and cut-over by parallel run until the authority chooses.

ContinueSchematic: eight illustrative interface lines.

What is delivered

Every interface gets one owner, one standard and one test.

We integrate the systems a state already runs through documented, revocable interfaces, each under its own signed data-sharing instrument.

One row of the interface scheduleNumberI-03Every line is numbered and owned.Supplier of recordOne supplierOne name answers for it.ConsumerRegistryThe system that calls it.StandardOpenAPI 3.1A published specification.Contract testPassedMust pass on every release.Test environmentBefore day oneExists before the effective date.Effective dateDatedNo line is live without one.A link stays dormant in a test console until itsdata-sharing instrument is signed. The owner can switch any link off.
Schematic. The schedule is the contract of the integration.

The interface schedule names, for each line, one supplier of record, the consuming system, the published standard, the contract test that must pass and the test environment where it runs before the effective date.

  • AgencyKeeps its own system and gains a documented interface.
  • OperatorConnects once; is read, never written into.
  • RegulatorSees which links are live, under which instrument.

Method

Integration is four moves, and the first line of code comes third.

ExistingPlatformTest environmentI-01OpenAPI 3.1I-02ISO 20022I-03Mobile Money APII-04SFTP batchschema · auth · sequence · retry · errorsParallel run · gap between old and new, illustrativetoleranceAuthority chooses
STEP 01

Write the schedule before any code

Every line is numbered, with one supplier of record, one standard and one owner. Nothing is built against an interface that is not on the schedule.

STEP 02

Write a contract test for each line

A contract test states what a line must do: valid messages, authenticated callers, continuous sequence numbers, idempotent retries. It runs on every release, not once.

STEP 03

Run every line in a test environment before the effective date

The environments exist before the contract is effective, so the first live day is not the first test. A line stays dormant until its data-sharing instrument is signed.

STEP 04

Cut over by parallel run, until the authority chooses

The new basis runs beside the old one and the system reports the gap. A named public officer decides when the new basis becomes the official one.

Illustrative gap

Instrument

Links between registries grow with the square, an exchange grows with the count.

A hub reduces the number of bilateral links among n registries from n(n-1)/2 to n. Move the number of registries; every link still needs its own signed instrument.

Hub or meshIllustrative count
10 registries
Mesh: every pair is a linkHub: every registry is one linkOne controlledexchange gateway
Mesh links
45
Hub links
10
Links avoided
35

Each of the 45 bilateral links would need its own interface, its own test and its own signed data-sharing instrument. Through one controlled exchange gateway, each registry links once: 10 links, and every one still sits on its own legal footing.

Contract tests

A broken line is found on a test environment, and it holds the gate.

Choose a line and introduce a breaking change. That line fails, the others stay green, and the effective-date gate does not open.

Contract-test consoleSimulated
Interface line
Change
I-01OpenAPI 3.1I-02ISO 20022I-03Mobile Money APII-04SFTP batchI-05Event streamI-06REST over mTLSI-07gRPC over mTLSI-08Signed read-only

Checks on I-04

  • Message validates against the published schemaPassed
  • Caller is authenticated, mutual TLSPassed
  • Sequence numbers are continuousPassed
  • A retry is idempotentPassed
  • Errors follow the published codesPassed
Lines passing
8 of 8
Effective-date gate
Open

All eight lines pass their contract tests on every release. Choose a line and introduce a breaking change to see the gate hold.

Standards

Lines speak published standards, so a new supplier can plug in without a negotiation.

Each kind of interface is built to a named, public specification.

Published API for institutionsOpenAPI 3.1Payments between institutionsISO 20022Wallet providersGSMA Mobile Money APISign-in for named staffW3C WebAuthnSecurity of the platformISO/IEC 27001:2022
Schematic. Standards are designed against; none is claimed as certified.
Standards and their sources
OpenAPI 3.1OpenAPI Specification for describing HTTP interfacesOpenAPI 3.1OpenAPI Specification for describing HTTP interfaces.Source: Standard body publication: OpenAPI 3.1. Open the publication ↗
ISO 20022Universal financial industry message schemeISO 20022Universal financial industry message scheme.Source: Standard body publication: ISO 20022. Open the publication ↗
GSMA Mobile Money APIHarmonised interface specification for mobile money providersGSMA Mobile Money APIHarmonised interface specification for mobile money providers.Source: Standard body publication: GSMA Mobile Money API. Open the publication ↗
W3C WebAuthnWeb Authentication: phishing-resistant sign-in with public-key credentialsW3C WebAuthnWeb Authentication: phishing-resistant sign-in with public-key credentials.Source: Standard body publication: W3C WebAuthn. Open the publication ↗
ISO/IEC 27001:2022Information security management systems: requirementsISO/IEC 27001:2022Information security management systems: requirements.Source: Standard body publication: ISO/IEC 27001:2022. Open the publication ↗

Cut-over

Cut-over is a comparison that closes, not a date on a calendar.

The new basis runs beside the old one. Add periods with the scrubber and choose a tolerance. Every gap is illustrative.

Parallel run, gap between old and new basisIllustrative
12 periods
Tolerance
0%2%4%6%123456789101112PeriodtoleranceEvidence sufficient
Periods run
12 periods
Latest gap
0.1%
In tolerance in a row
7
Evidence
Period 8

Three periods in a row agree within the tolerance, from period 8. That is evidence, not a decision: a named public officer chooses when the new basis becomes the official one.