Service 07 of 07
One exchange replaces a mesh of links.
Each line tested first.
One named supplier per interface, a contract test on every line, and cut-over by parallel run until the authority chooses.
What is delivered
Every interface gets one owner, one standard and one test.
We integrate the systems a state already runs through documented, revocable interfaces, each under its own signed data-sharing instrument.
The interface schedule names, for each line, one supplier of record, the consuming system, the published standard, the contract test that must pass and the test environment where it runs before the effective date.
- AgencyKeeps its own system and gains a documented interface.
- OperatorConnects once; is read, never written into.
- RegulatorSees which links are live, under which instrument.
Method
Integration is four moves, and the first line of code comes third.
Write the schedule before any code
Every line is numbered, with one supplier of record, one standard and one owner. Nothing is built against an interface that is not on the schedule.
Write a contract test for each line
A contract test states what a line must do: valid messages, authenticated callers, continuous sequence numbers, idempotent retries. It runs on every release, not once.
Run every line in a test environment before the effective date
The environments exist before the contract is effective, so the first live day is not the first test. A line stays dormant until its data-sharing instrument is signed.
Cut over by parallel run, until the authority chooses
The new basis runs beside the old one and the system reports the gap. A named public officer decides when the new basis becomes the official one.
Illustrative gapInstrument
Links between registries grow with the square, an exchange grows with the count.
A hub reduces the number of bilateral links among n registries from n(n-1)/2 to n. Move the number of registries; every link still needs its own signed instrument.
- Mesh links
- 45
- Hub links
- 10
- Links avoided
- 35
Each of the 45 bilateral links would need its own interface, its own test and its own signed data-sharing instrument. Through one controlled exchange gateway, each registry links once: 10 links, and every one still sits on its own legal footing.
Contract tests
A broken line is found on a test environment, and it holds the gate.
Choose a line and introduce a breaking change. That line fails, the others stay green, and the effective-date gate does not open.
Checks on I-04
- Message validates against the published schemaPassed
- Caller is authenticated, mutual TLSPassed
- Sequence numbers are continuousPassed
- A retry is idempotentPassed
- Errors follow the published codesPassed
- Lines passing
- 8 of 8
- Effective-date gate
- Open
All eight lines pass their contract tests on every release. Choose a line and introduce a breaking change to see the gate hold.
Standards
Lines speak published standards, so a new supplier can plug in without a negotiation.
Each kind of interface is built to a named, public specification.
| OpenAPI 3.1 | OpenAPI Specification for describing HTTP interfaces | OpenAPI 3.1OpenAPI Specification for describing HTTP interfaces.Source: Standard body publication: OpenAPI 3.1. Open the publication ↗ |
|---|---|---|
| ISO 20022 | Universal financial industry message scheme | ISO 20022Universal financial industry message scheme.Source: Standard body publication: ISO 20022. Open the publication ↗ |
| GSMA Mobile Money API | Harmonised interface specification for mobile money providers | GSMA Mobile Money APIHarmonised interface specification for mobile money providers.Source: Standard body publication: GSMA Mobile Money API. Open the publication ↗ |
| W3C WebAuthn | Web Authentication: phishing-resistant sign-in with public-key credentials | W3C WebAuthnWeb Authentication: phishing-resistant sign-in with public-key credentials.Source: Standard body publication: W3C WebAuthn. Open the publication ↗ |
| ISO/IEC 27001:2022 | Information security management systems: requirements | ISO/IEC 27001:2022Information security management systems: requirements.Source: Standard body publication: ISO/IEC 27001:2022. Open the publication ↗ |
Cut-over
Cut-over is a comparison that closes, not a date on a calendar.
The new basis runs beside the old one. Add periods with the scrubber and choose a tolerance. Every gap is illustrative.
- Periods run
- 12 periods
- Latest gap
- 0.1%
- In tolerance in a row
- 7
- Evidence
- Period 8
Three periods in a row agree within the tolerance, from period 8. That is evidence, not a decision: a named public officer chooses when the new basis becomes the official one.
Continue
Once the lines are tested, the exchange itself is the product.
Interoperability
The controlled exchange gateway, signed exchange logs and certificates anyone can verify.
Read the technologyInstrumentAPI mesh
Compare a mesh of bilateral links with a hub, for the registries you choose.
Open the instrumentSectorDigital public infrastructure
Registry interoperability, identity verification and government payments.
Read the sector