From pit to port,
every tonne tagged.

Tonnes, moisture and grade decide what a mine owes. We tag each tonne at the weighbridge, the assay, the rail head and the quay, and reconcile the tags on one lot identifier.

ContinueSchematic. Tonnages are illustrative.

What is at stake

What a mine owes is a product of four factors, and each is measured by a party with an interest

Payable metal is tonnes, times grade, times recovery, valued at a price. A royalty follows the product. The measurement of each factor decides how much of it reaches the public.

Dry tonnesWeighbridge×GradeSampling, assay×RecoveryPlant accounting×PriceMarketEVERY FACTOR NEEDS ITS OWN STATION, BECAUSE AN ERROR IN ONE MOVES THE WHOLE PRODUCT
Schematic. The first three factors are physical and can be measured independently. The price is not ours to measure.
USD 40bnUSD 40bnEstimated export under-invoicing of extractive commodities from Africa in 2015.Source: UNCTAD, Economic Development in Africa Report 2020. Open the publication ↗

Estimated export under-invoicing of extractive commodities from Africa in 2015.

UNCTAD, Economic Development in Africa Report 2020

USD 88.6bnUSD 88.6bnEstimated illicit capital flight from Africa per year, about 3.7 percent of the continent's GDP.Source: UNCTAD, Economic Development in Africa Report 2020. Open the publication ↗

Estimated illicit capital flight from Africa per year, about 3.7 percent of the continent's GDP.

UNCTAD, Economic Development in Africa Report 2020

Both figures are published estimates for Africa. The first covers all extractive commodities.

Where value escapes

An error in any one factor moves payable metal by the same share, so each factor needs its own witness

Pick a factor and an error. The payable metal moves by exactly that relative amount, which is why no single measurement can stand in for the others.

Payable metal, one factor wrong Illustrative inputs
Which factor is misdeclared
-5.0%

Reference lot: 1,000 dry tonnes at a grade of 2 percent and a recovery of 90 percent, all illustrative. Moisture, scale error and a stockpile balance can all move the tonnes. Sampling, preparation and assay can move the grade.

True payable metal
18.0
As declared
17.1
Difference
-0.9
Relative
-5.0%
TONNESmeasured×GRADEmeasured×RECOVERYmeasuredTRUEDECLAREDBars are drawn to one scale, from zero.

What we build

Five stations on one lot identifier let any tonne be followed, and any leg be tested

A weighbridge alone cannot say where a tonne was lost. Five stations, each reading its own sensors, can.

Pit weighbridgeAxle load cells; vehicle and lot readSampling and assayAutomatic samplers; sealed chain to the laboratoryRail load-outWagon identifiers read; seals; GPS if no feedPort receiptWeighbridge or belt scale; stockpile balanceShip loadingDraft survey; bill of lading tonnageLOT IDENTIFIER
Schematic. The vertical line is the lot identifier that joins every record.

The checkpoints are reconciled in sequence. A tag at each station is compared with the one before it. A leg that exceeds its tolerance opens an exception for a named public owner.

  • Royalty verification: the royalty base is recomputed from dry tonnage and assayed grade, and compared with what was declared.
  • Disclosure: payments and volumes are reconciled in a form that supports EITI-style reportingEITI Standard 2023Extractive Industries Transparency Initiative global standard.Source: Standard body publication: EITI Standard 2023. Open the publication ↗.
  • Studies first: environmental and social impact assessment and corridor studies precede any build.
  • Chain of custody: sealed samples and signed hand-overs, in line with responsible sourcing guidanceOECD Due Diligence GuidanceDue diligence for responsible supply chains of minerals from conflict-affected and high-risk areas.Source: Standard body publication: OECD Due Diligence Guidance. Open the publication ↗.

One tonne

A tonne leaves the pit wet and reaches the ship as a reconciled, dry royalty base

Four steps along an L-shaped corridor. Scroll to move the tonne and watch its tags accumulate.

1,000 t wetPIT920 t dryRAIL918 tPORT917 tSHIPRoyalty base: 917 t dry
Schematic. Tonnages are illustrative.
Step 1 of 4

It is weighed wet and sampled at the pit

The weighbridge reads gross and tare by axle load cell, and the vehicle and lot identifiers. An automatic sampler takes a sealed sample. Moisture and grade return from the laboratory chain, so the wet tonne can be restated dry.

Step 2 of 4

It leaves by rail under a wagon identifier

Wagon identifiers and seals are read at load-out, with GPS where no incumbent feed exists. The load-out tag must reconcile with the dry tonnage inside its tolerance, or an exception opens.

Step 3 of 4

It is received and weighed again at the port

The port weighbridge or belt scale, and the stockpile balance, give a third tag. Loss in transit becomes a figure with a tolerance rather than a surprise.

Step 4 of 4

It is surveyed on the ship and joined to the royalty base

The draft survey gives the ship's tonnage and the bill of lading declares it. The five tags reconcile on one identifier. The royalty base is the dry tonnage at the last tag.

Instrument

A corridor reconciles only when every leg closes inside its tolerance

Move the losses and the tolerance. The first leg that opens is the one a named public owner receives. All inputs are illustrative.

Corridor reconciler Illustrative inputs
1000
8.0%
0.20%
0.10%
0.05%
0.50%
Pit weighbridge1 000.0-8.00%Pit, dry basis920.0-0.20%Rail load-out918.2-0.10%Port receipt917.2-0.05%Ship draft survey916.8
Tolerance per leg
0.50%
First exception
None
Corridor reconciledEvery leg closes inside the tolerance. The royalty base is the dry tonnage at the last tag.

How it is financed and delivered

A corridor is financed by what it carries, so the studies come first and the guarantee comes last

Studies set the case. The finance follows the service: private equity, then senior and local-currency debt, then the routes that suit the asset.

  1. Pre-feasibilityDemand, route options and a first model.
  2. Definitive feasibilityTechnical, legal, economic, delivery and international evidence volumes.
  3. Impact assessmentEnvironmental and social study and corridor design.
  4. StructureConcession, financing and acceptance gates.
USD 130bn to 170bnUSD 130bn to 170bnEstimated annual infrastructure investment needs of Africa.Source: African Development Bank, African Economic Outlook 2018. Open the publication ↗

Estimated annual infrastructure investment needs of Africa.

African Development Bank, African Economic Outlook 2018

USD 68bn to 108bnUSD 68bn to 108bnEstimated annual infrastructure financing gap of Africa.Source: African Development Bank, African Economic Outlook 2018. Open the publication ↗

Estimated annual infrastructure financing gap of Africa.

African Development Bank, African Economic Outlook 2018

Both figures are annual estimates for Africa. They size the need that corridors compete to meet. They are not a forecast for any project.

Private equity, standby commitmentsSenior debtLocal-currency debtDevelopment finance, export creditLocal investor tranches
Schematic. Layers are sources, not amounts. No state guarantee is required where the service pays for itself.

Standards

Disclosure and sourcing standards are published, and the corridor is designed against them

Designed against, and never claimed as certified.

  • EITI Standard 2023EITI Standard 2023Extractive Industries Transparency Initiative global standard.Source: Standard body publication: EITI Standard 2023. Open the publication ↗

    Extractive transparencyExtractive Industries Transparency Initiative global standard. The global standard for disclosing what extractive companies pay and what states receive.

  • OECD Due Diligence GuidanceOECD Due Diligence GuidanceDue diligence for responsible supply chains of minerals from conflict-affected and high-risk areas.Source: Standard body publication: OECD Due Diligence Guidance. Open the publication ↗

    Responsible supply chainsDue diligence for responsible supply chains of minerals from conflict-affected and high-risk areas. Due diligence guidance that the chain of custody and sampling records support.

  • ISO/IEC 17025:2017ISO/IEC 17025:2017General requirements for the competence of testing and calibration laboratories.Source: Standard body publication: ISO/IEC 17025:2017. Open the publication ↗

    Assay laboratoriesGeneral requirements for the competence of testing and calibration laboratories. Competence of the laboratories whose results enter the ledger.

  • ISO/IEC 27001:2022ISO/IEC 27001:2022Information security management systems: requirements.Source: Standard body publication: ISO/IEC 27001:2022. Open the publication ↗

    Information securityInformation security management systems: requirements. The management system around signed tonnage and assay records.

Search CFA Ventures

Type to search.