Every cubic metre is billed or lost.
Find which.

A utility produces one volume, bills a smaller one and loses the rest. We design the water balance that gives every cubic metre an address.

ContinueSchematic. Shares illustrative.

The stakes

Non-revenue water is a loss measured in billions of cubic metres.

Water that is made and not billed is paid for twice: once in treatment and pumping, and again in revenue that never arrives.

126 billion m³

Estimated volume of non-revenue water lost by utilities worldwide each year

Liemberger and Wyatt, Water Supply 19(3), 2019

126 billion m³Estimated volume of non-revenue water lost by utilities worldwide each year.Source: Liemberger and Wyatt, Water Supply 19(3), 2019. Open the publication ↗
USD 39bn

Estimated annual value of that non-revenue water

Liemberger and Wyatt, Water Supply 19(3), 2019

USD 39bnEstimated annual value of that non-revenue water.Source: Liemberger and Wyatt, Water Supply 19(3), 2019. Open the publication ↗
System input volumeWater put into the networkBilled consumptionWhat is invoicedNon-revenue waterWhat is not=+Non-revenue water is unbilled authorised use, apparent losses and real losses.
Definition after the standard water balance.IWA water balanceInternational Water Association standard water balance and non-revenue water terminology.Source: Standard body publication: IWA water balance. Open the publication ↗

The mechanism

Leakage is a residual, so a small meter error becomes a large leakage error.

Real losses are what remains after everything else is measured or estimated. Every error upstream lands on them.

Water balance, per 100 units read at the input meter Illustrative

0.0%
60%
11%
Real losses
25.0units
Non-revenue water
40.0%
Shift in real losses
no shift
Relative change
none

Read at the meterWater balanceReal losses are the residual: they absorb any error in the others.
  • Billed consumption 60%
  • Unbilled authorised use 4%
  • Apparent losses 11%
  • Real losses (residual) 25.0
IllustrativeSchematic. Shares of the input read at the meter, chosen for illustration. A true input above the reading adds to real losses; one below it subtracts.

This is why the balance starts with the input meter, and why a metered district is more trustworthy than a whole system estimated from the top.

One district

A district meter and a quiet hour locate the leakage in a network.

Follow one district metered area. The flows and times are illustrative.

Closed boundaryInlet00:0006:0012:0018:0024:00Inlet flow over 24 hours3422 leakagelegitimate night use, 12Leakage per connection, by districtD411D67D26D55D15D3424after repair

District 1 of 5

Valves turn a network into districts.

A district metered area has a closed boundary and few inlets, so what enters can be measured and what is used can be estimated.

District 2 of 5

One inlet meter reads the district all day.

The reading is the district's own system input volume, signed and time-stamped at the meter.

Flows in cubic metres an hour Illustrative

District 3 of 5

At night customers sleep, and what still flows is mostly leakage.

The minimum night flow, less what the connections legitimately draw at that hour, is the leakage. Here 34 less 12 leaves 22.

Night minimum 34, legitimate 12 Illustrative

District 4 of 5

Districts are ranked, and the worst is searched first.

Leakage per connection ranks them, so crews go where a repair saves the most water.

Worst district: 11 litres per connection an hour Illustrative

District 5 of 5

After repair the night minimum falls, and the balance closes again.

Same meter, same hour. The lower minimum is the verified result, and in a performance-based contract it is what is paid on.

Night minimum: 34 to 24 Illustrative

The estimator

The minimum night flow is the cheapest leakage meter a utility owns.

At the quietest hour customers draw little. What the district meter still reads is leakage, once the legitimate night use of its connections is taken out.

Night-flow estimator, one district Illustrative

34 m³/h
2,000
6 L/h
Leakage
22.0m³/h
Share of night flow
65%
Per connection
11.0L/h
At the night rate, a day
528m³

020406080Minimum night flow, cubic metres an hour
  • Legitimate night use 12.0
  • Leakage 22.0
IllustrativeSchematic. Defaults chosen for illustration. The day figure applies the night rate for twenty-four hours and so overstates it where pressure falls by day.

What we build

Five capabilities take a utility from an estimated balance to a verified one.

Each reads copies of the utility's own data and writes nothing into its systems.

ProductionNight minimumCustomer metersPaid on result

Water balance and audit

A balance that separates apparent from real.

The audit builds the water balance, labels each component as measured, calculated or estimated, and says "unknown" where it cannot tell. It follows the standard terminology IWA water balanceInternational Water Association standard water balance and non-revenue water terminology.Source: Standard body publication: IWA water balance. Open the publication ↗.

District metered areas

Boundaries, valves and one inlet.

Districts are surveyed, designed and instrumented node by node, and a node counts only after the legal-metrology body has verified its meter.

Night-flow analysis

The quietest hour finds the loudest leak.

Night minima rank districts and trigger leak searches. A district whose minimum falls after repair has a verified result, not a promise.

Meter replacement programmes

Customer meters that read true.

Programmes are packaged with common interface schedules and factory-tested equipment. Meters follow the published water-meter standards ISO 4064 seriesWater meters for cold potable water and hot water.Source: Standard body publication: ISO 4064 series.OIML R 49Water meters for cold potable water and hot water: metrological and technical requirements.Source: Standard body publication: OIML R 49..

Performance-based contracts

Paid on what is verified.

Fees are set against published indicators and a reference trajectory. An out-of-tolerance reading stays provisional and earns nothing, and the state's share is paid first.

Financing and delivery

A performance contract pays for verified reduction, never for work performed.

Fees follow a reference trajectory. Illustrative years and shares.

4040Baseline3736Year 13432Year 23229Year 33027Year 42825Year 5
  • Reference trajectory, non-revenue water %
  • Verified result, non-revenue water %

Illustrative Schematic. Values chosen for illustration, not a forecast.

Year 3

Baseline: audited before the first fee.

An independent audit fixes the starting balance and its uncertainty. Under-sampled areas are labelled, never interpolated.

Year 1: districts are metered and the first leaks are found.

The verified result is below the baseline, and above the reference trajectory only where a night minimum has actually fallen.

Year 2: repair waves follow the ranking.

Fees accrue on registered, verified reduction. A reading out of tolerance stays provisional and earns nothing.

Year 3: the verified result runs ahead of the trajectory.

Upside above the reference trajectory is shared with the state, and the state's share is paid first.

Year 4: a renewal wave replaces meters that drift.

Calibration runs on schedule, and service-level penalties are computed from telemetry the owner can read directly.

Year 5: hand-over rehearsals begin.

Assets, code and skills transfer to the national owner at the end of the term, free of charge.

Standards

Water balance, meters, laboratories and security each follow a published standard.

Standards we design against. None is claimed as a certification.

IWA water balanceIWA water balanceInternational Water Association standard water balance and non-revenue water terminology.Source: Standard body publication: IWA water balance. Open the publication ↗

International Water Association standard water balance and non-revenue water terminology.

Water balance terms
ISO 4064 seriesISO 4064 seriesWater meters for cold potable water and hot water.Source: Standard body publication: ISO 4064 series.

Water meters for cold potable water and hot water.

Customer water meters
OIML R 49OIML R 49Water meters for cold potable water and hot water: metrological and technical requirements.Source: Standard body publication: OIML R 49.

Water meters for cold potable water and hot water: metrological and technical requirements.

Water meter requirements
ISO/IEC 17025:2017ISO/IEC 17025:2017General requirements for the competence of testing and calibration laboratories.Source: Standard body publication: ISO/IEC 17025:2017. Open the publication ↗

General requirements for the competence of testing and calibration laboratories.

Calibration laboratories
ISO/IEC 27001:2022ISO/IEC 27001:2022Information security management systems: requirements.Source: Standard body publication: ISO/IEC 27001:2022. Open the publication ↗

Information security management systems: requirements.

Information security
IEC 62443IEC 62443Security for industrial automation and control systems.Source: Standard body publication: IEC 62443. Open the publication ↗

Security for industrial automation and control systems.

Control-system security
OpenAPI 3.1OpenAPI 3.1OpenAPI Specification for describing HTTP interfaces.Source: Standard body publication: OpenAPI 3.1. Open the publication ↗

OpenAPI Specification for describing HTTP interfaces.

Published interfaces
W3C WebAuthnW3C WebAuthnWeb Authentication: phishing-resistant sign-in with public-key credentials.Source: Standard body publication: W3C WebAuthn. Open the publication ↗

Web Authentication: phishing-resistant sign-in with public-key credentials.

Phishing-resistant sign-in

Search CFA Ventures

Type to search.