Service 06 of 07
A sample is a claim with an interval.
We publish both.
Independent audits by stratified sample. The interval is published; areas not sampled are labelled, never interpolated.
What is delivered
A reconciliation that nobody audited is a claim, not a record.
Three independent lenses test what the system says against what instruments, ledgers and counterparties say.
We carry out independent revenue audits, metrology audits and reconciliation audits. Each draws a stratified sample, publishes the confidence interval, and labels any area that was under-sampled instead of interpolating across it.
You receive:
- 01A report in numbered volumes, with a reading guide.
- 02An evidence manifest, so any month can be replayed in isolation.
- 03Exception cases, each routed to a named public owner.
Method
A sample is drawn in four steps, and each one can be repeated by someone else.
List the population from the write-once store
Every record in scope is listed once, with its stratum. The audit starts from a frame the auditor can recount, not from a summary.
Group records by how much evidence already exists
Records that a third party also reports sit in one stratum, and self-declared records in another. Published evidence says the two behave very differently, so they are not averaged together.
Draw the sample stratum by stratum
The draw uses a seed the auditor records, so the same sample can be drawn again. Size and variability decide how many records each stratum gets.
Publish the interval and label what was not reached
A stratum with too few records is shown as under-sampled. It is never filled in from its neighbours: an area we could not measure is unknown, and the report says so.
Illustrative sampleInstrument
The same budget buys a narrower interval when the draw follows the variability.
Choose how the sample is allocated and how large it is. Dots, strata and the published interval recompute. Population, variability and results are illustrative.
- Sample
- 120 records
- Interval
- ± 0.35 points
- Of population
- 3.0%
- Under-sampled
- None
Every stratum is covered. Allocation follows size and variability, so the interval is as narrow as this sample size allows.
Where to look
Published evidence puts the largest gaps where nobody else reports.
Misreporting by degree of information reporting. These are published rates from tax-audit studies, used here to justify strata, not to size any country.
| 0.3% | Evasion rate on income reported by third parties (employers, banks) in a randomised tax-audit experiment | 0.3%Evasion rate on income reported by third parties (employers, banks) in a randomised tax-audit experiment.Source: Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011. Open the publication ↗ |
|---|---|---|
| 1% | Net misreporting rate on income subject to substantial information reporting and withholding | 1%Net misreporting rate on income subject to substantial information reporting and withholding.Source: US Internal Revenue Service, Publication 1415, Tax Gap Estimates for Tax Years 2011 to 2013 (2019). Open the publication ↗ |
| 5% | Net misreporting rate on income subject to substantial information reporting without withholding | 5%Net misreporting rate on income subject to substantial information reporting without withholding.Source: US Internal Revenue Service, Publication 1415, Tax Gap Estimates for Tax Years 2011 to 2013 (2019). Open the publication ↗ |
| 37% | Evasion rate on self-reported income in the same experiment | 37%Evasion rate on self-reported income in the same experiment.Source: Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011. Open the publication ↗ |
| 55% | Net misreporting rate on income subject to little or no information reporting | 55%Net misreporting rate on income subject to little or no information reporting.Source: US Internal Revenue Service, Publication 1415, Tax Gap Estimates for Tax Years 2011 to 2013 (2019). Open the publication ↗ |
Metrology audit
A meter inside its limit is a fact; one outside it is a hold.
Enter the as-found error of a custody-transfer meter and read it against the two legal limits of an accuracy class 0.3 system.
Limits from OIML R 117-1:2019 for the accuracy class: meter alone 0.2%Maximum permissible error of the meter alone in the same accuracy class.Source: OIML R 117-1:2019, Dynamic measuring systems for liquids other than water. Open the publication ↗ and whole measuring system 0.3%Maximum permissible error of an accuracy class 0.3 dynamic liquid measuring system (custody transfer of crude oil and products).Source: OIML R 117-1:2019, Dynamic measuring systems for liquids other than water. Open the publication ↗. Reference conditions 15 °C and 101.325 kPa15 °C and 101.325 kPaStandard reference conditions for petroleum and liquid petroleum products.Source: ISO 5024:1999, Petroleum liquids and liquefied petroleum gases, measurement, standard reference conditions. Open the publication ↗.
- As-found error
- +0.14%
- Reading
- Within the meter limit
The as-found record is kept as it stands. If the meter is adjusted, the as-left record shows the new state, and both stay filed against the node.
Reporting
A report that fills its gaps claims knowledge it does not have.
Drag the divider. On the left, a smooth map fills every cell. On the right, the published report shows what was measured and labels what was not.
Independence
Three duties never sit with one person, so no certificate can mark its own homework.
Those who configure meters do not reconcile volumes and do not issue certificates.
General requirements for the competence of testing and calibration laboratories
Designed against; not claimed as certified.
ISO/IEC 17025:2017General requirements for the competence of testing and calibration laboratories.Source: Standard body publication: ISO/IEC 17025:2017. Open the publication ↗Dynamic measuring systems for liquids other than water
Designed against; not claimed as certified.
OIML R 117-1:2019Dynamic measuring systems for liquids other than water.Source: Standard body publication: OIML R 117-1:2019. Open the publication ↗Petroleum measurement: standard reference conditions
Designed against; not claimed as certified.
ISO 5024:1999Petroleum measurement: standard reference conditions.Source: Standard body publication: ISO 5024:1999. Open the publication ↗Continue
Audit finds the gap; the instruments below let you size it before anything is built.
Uncertainty budget
Combine the terms of a measurement by root sum of squares and compare with the legal limit.
Open the instrumentTechnologyReconciliation engine
The versioned rules that open an exception case for every variance.
Read the technologyInsightMeasure before you tax
Why revenue that a third party reports is almost always declared.
Read the insight