Metered districts show, hour by hour, where a coastal city’s water is lost before it is billed.

ContinueSchematic. Illustrative districts and night flows.

The situation, from public evidence

Non-revenue water is a loss twice over: the water, and the revenue it would have earned.

Non-revenue water is the part of what a utility puts into its network that earns nothing: leakage, consumption that is never metered or paid, and water authorised free of charge. The standard water balance of the International Water Association names each part so that each can be measured on its own.IWA water balanceInternational Water Association standard water balance and non-revenue water terminology.Source: Standard body publication: IWA water balance. Open the publication ↗

126 billion m³Estimated volume of non-revenue water lost by utilities worldwide each year.126 billion m³Estimated volume of non-revenue water lost by utilities worldwide each year.Source: Liemberger and Wyatt, Water Supply 19(3), 2019. Open the publication ↗
USD 39bnEstimated annual value of that non-revenue water.USD 39bnEstimated annual value of that non-revenue water.Source: Liemberger and Wyatt, Water Supply 19(3), 2019. Open the publication ↗
System input volume
Authorised consumption
Water losses
Billed authorised consumption
Unbilled authorised consumption
Apparent lossesmeter error, theft, data errors
Real lossesleakage and overflow
Revenue water
Non-revenue water
Schematic of the IWA standard water balance. Boxes show structure, not proportions.

The design

District meters turn one network into twelve questions a crew can answer.

SchematicCity grid, twelve districtsA1A2A3A4B1B2B3B4C1C2C3C4One district over 24 hoursnight minimumexpected legitimate night use00:0024:00Ranked by night-flow excessB3A2C2B1C4A4B4C3B2A1A3C1Illustrative units per hour
STEP 01

Divide the network into district metered areas.

Boundary valves and one meter at each inlet turn a single network into districts whose inflow can be read on its own, each small enough for one crew to work through.

STEP 02

Read every inlet through the night.

In the small hours legitimate use is at its lowest, so the minimum that still flows is mostly leakage. A copy of each meter’s signal is read; nothing is written into the utility’s control system.

STEP 03

Rank districts by night-flow excess.

Subtract the night use expected from demand and what remains orders the districts. The ranking proposes where to look first. It decides nothing.

STEP 04

Send crews where the ranking points, then measure again.

Every repair is verified at the same meter and the district is re-ranked. A repair that does not lower the night minimum is not counted as recovered.

Instrument

The night minimum falls where leaks are fixed, and the ranking moves with it.

Choose a district and set how much of its leakage has been found and fixed. All values are illustrative units per hour.

District

Low town

Illustrative input. The share of this district's leakage located, repaired and verified at its meter.

Illustrative Districts, demands and leakage are invented units per hour, generated for this page.

Night minimum
54.0units per hour
Excess over expected use
46.0calculated
Rank of twelve
1by excess
night window00:0006:0012:0018:0024:000units/hInflow with leakage (solid); legitimate demand alone (light)
  1. 1B346.0
  2. 2A238.0
  3. 3C230.0
  4. 4B127.0
  5. 5C424.0
  6. 6A421.0
  7. 7B418.0
  8. 8C315.0
  9. 9B214.0
  10. 10A112.0
  11. 11A39.0
  12. 12C17.0

Illustrative deployment plan

Metering comes before repair, and the first ranking arrives in the last third of 90 days.

Inlet meters and boundary valves
Long-lead meters ordered before day one, installed node by node
Data centres and evidence platform
Two in-country sites; first feeds and academy open
Night-flow reading from every district
Run in parallel with existing billing records
Dashboards and the first ranking
First statements and acceptance
Repair waves with verification
Each recovery proved at its district meter
Meter replacement programme
Customer meters tested before they are replaced
Illustrative Phases follow the delivery model of the firm; spans are not a commitment for any programme.

Illustrative financing

A performance contract pays for recovered water, measured at the district meter.

Payment follows the verified fall in losses. The baseline is fixed by an independent water balance before any work starts.

  1. The utility’s baseline revenue

    Kept whole. The baseline comes from an independent audit of the water balance.

  2. The public owner’s share of recovered revenue

    Paid first, from an escrowed collection account in which the operator is not a signatory.

  3. The fee on verified recovery

    Paid only where a repair lowers the night minimum at its meter. No record, no fee.

  4. Debt service and reserve accounts

    Senior and local-currency lenders, with reserves topped up before any distribution.

  5. Investor return

    Equity with standby commitments, and local investor tranches.

  6. Upside above the reference trajectory

    Shared with the public owner when recovery runs ahead of the agreed path.

Illustrative Order of payment, schematic: tiers, not proportions.

Governance

The ranking proposes; a named utility engineer decides where a crew goes.

  1. 01

    District meters

    Their signals are read as copies; the utility’s control system is never written to.

  2. 02

    The night-flow ranking

    Orders districts by excess. No algorithm may approve an adjustment.

  3. 03

    A named utility engineer

    Decides which district to enter and which crew to send.

  4. 04

    An independent auditor

    Verifies the water balance and each claimed recovery from its evidence manifest.

  5. 05

    The record

    A recovery enters the record only when the district meter shows it. Anything incomplete stays provisional and earns no fee.

The system prepares evidence and proposes. A named public officer decides. The operator never assesses, collects or enforces.

What would be measured

Each indicator states how it was obtained, and a gap stays a gap.

  • Measured

    System input per district

    Inlet meter readings, with an uncertainty budget per meter.

  • Measured

    Night-flow minimum

    The lowest inflow of each district in the night window, read continuously.

  • Calculated

    Excess over expected night use

    Night minimum less the legitimate use expected from demand; the rule is versioned and dated.

  • Estimated

    Customer meter accuracy

    As-found and as-left tests on a stratified sample, with a published confidence interval.

  • Calculated

    Recovered volume verified

    Share of claimed recoveries confirmed at the district meter and by audit sampling.

Risks

The largest risks sit in the records and the meters before they sit in the pipes.

Likelihood, lower to higherImpact, lower to higher12345
  1. Network records do not match the ground

    Surveys come before design, and district boundaries are proven by closing tests.

  2. Customer meters under-register

    Apparent losses hide in meter error, so meters are tested before they are replaced.

  3. A boundary valve leaks

    A district with a leaking boundary is flagged and its ranking labelled provisional.

  4. Leaks return after repair

    Maintenance and renewal waves are part of the term, and the night minimum is watched continuously.

  5. The baseline is disputed

    The baseline is audited and published before the first payment.

Illustrative Qualitative placement by the authors of this case, not a measured assessment.