Skip to content
Menu

Twelve sectors, one architecture

Twelve sectors.
One channel.

In every sector the value that matters crosses a line: a boundary, a meter, a gate, a registry. We build the measurement at that line and one evidence ledger behind it.

ContinueSchematic. The index numbers match the list below.

Index

Each sector has one line its value crosses, and one thing worth counting there

For each of the twelve sectors: what is measured at the line, and what the firm builds around it. Filter by family or open any sector.

Show a family
01

Oil and gas

Measured
Volume and quality at every boundary crossing: crude, products, bunkers and pipeline gas.
We build
Custody-transfer metering, depot and refinery balances and a national hydrocarbon ledger.
Open sector: Oil and gas
02

Gold, silver and precious metals

Measured
Mass, density and purity of every parcel at the exit point.
We build
Exit-point scanning, XRF verification and certificate matching, with custody from the licensed buying centre.
Open sector: Gold, silver and precious metals
03

Mining and critical minerals

Measured
Tonnage, moisture and grade from the pit to the port.
We build
Mine-to-port reconciliation, royalty verification, environmental and corridor studies.
Open sector: Mining and critical minerals
04

Telecommunications

Measured
Voice, SMS, data, digital services, interconnect, roaming and mobile money.
We build
Independent revenue assurance, verified revenue statements, fraud management and quality-of-service probes.
Open sector: Telecommunications
05

Digital public infrastructure

Measured
Identity, contribution, payroll and payment exchanges between registries.
We build
One exchange gateway, identity verification, contribution platforms and government payments.
Open sector: Digital public infrastructure
06

Maritime and ports

Measured
Vessel movements, port calls, fisheries activity and bunkering.
We build
Maritime domain awareness, port community systems, maritime single windows and bunkering measurement.
Open sector: Maritime and ports
07

Customs and trade

Measured
Declarations, consignments, seals and scans at borders and ports.
We build
Single windows, transit monitoring with electronic seals, mirror-trade analysis, scanning integration and valuation risk.
Open sector: Customs and trade
08

Energy and power

Measured
Energy entering feeders against energy billed to consumers.
We build
Grid and feeder metering, revenue protection, loss analytics, prepaid metering integration and project development.
Open sector: Energy and power
09

Water utilities

Measured
System input against billed consumption, by metered area.
We build
Water balance, district metered areas, night-flow analysis, meter replacement and performance-based contracts.
Open sector: Water utilities
10

Transport infrastructure

Measured
Vehicle passages and rail and port throughput along a corridor.
We build
Toll-road and bridge concessions, tolling systems, traffic counting, corridor and construction finance.
Open sector: Transport infrastructure
11

Public finance and tax

Measured
Invoices, levies and third-party reports against what is declared.
We build
E-invoicing clearance, tax and levy rule engines, third-party information reporting and treasury reconciliation.
Open sector: Public finance and tax
12

Forestry and agriculture

Measured
Plot geolocation and export volumes, from plot to port.
We build
Plot traceability, due-diligence statements for regulated markets and export volume reconciliation.
Open sector: Forestry and agriculture

The unit of account

Whatever the sector, the unit can be counted twice, and the two counts compared

Choose a sector to see what is counted, where it is counted, what is sealed and what the count is reconciled against.

Sector

Oil and gas

The unit
A barrel, or a standard cubic metre of gas
Counted at
The terminal, the pipeline boundary, the ship manifold
Sealed as
Net standard volume at reference conditions, signed at the meter
Reconciled against
Bill of lading, outturn and tank balance
DECLAREDMEASUREDRead the oil and gas page (Oil and gas)

Telecommunications

The unit
A call, a message or a session record
Counted at
The operator network edge
Sealed as
A signed, pseudonymised batch of records
Reconciled against
Usage, rating, billing and finance
DECLAREDMEASUREDRead the telecommunications page (Telecommunications)

Customs and trade

The unit
A consignment
Counted at
The border post and the port gate
Sealed as
Declaration, seal and scan joined by one identifier
Reconciled against
Declaration against scan, and against the partner declaration
DECLAREDMEASUREDRead the customs and trade page (Customs and trade)

Energy and power

The unit
A kilowatt-hour
Counted at
The feeder head and the consumer meter
Sealed as
Metered input and billed energy per feeder
Reconciled against
Feeder meter against billing
DECLAREDMEASUREDRead the energy and power page (Energy and power)

One stack

Twelve sectors sit on one stack: only the first layer changes

The instruments at the edge belong to the sector. The ledger, the rules and the command centre are the same four layers every time.

Command centre and portalsOpens on exceptions, not totalsReconciliation and rulesVersioned, dated, testedEvidence ledgerOne identifier, append-onlyField and edge captureThe sector's own instruments
Schematic. Twelve sector modules attach to the first layer only.
Layer 1 of 4

The edge belongs to the sector

A custody meter, a scanner, a weighbridge, a collector or a gateway: each sector brings the instrument that suits its flow. Every reading is signed and time-stamped where it is made, then sent on.

Layer 2 of 4

One identifier joins everything

The ledger holds raw readings write-once and events append-only. One event identifier links the reading, the quantity, the declaration, the certificate and every later correction. A correction is a new signed event, never an overwrite.

Layer 3 of 4

Rules are versioned, and a variance is a case

Reconciliation rules compare what was measured with what was declared, against a dated rule set with reference tests. No rule approves an adjustment. Every variance opens an exception routed to a named public owner.

Layer 4 of 4

The authority decides, on evidence

The command centre opens on exceptions and follows any event from meter to closed balance. Systems prepare and propose. A named public officer assesses, and the operator never does.

Why measurement comes first

Where a third party measures the flow, reported income is almost always true income

Published evidence on one point: the less an income is reported by someone else, the more of it goes missing. It is the case for measuring before taxing.

Show
0%20%40%60%RANDOMISED AUDITReported by a third party0.3%Self-reported37%TAX-GAP ESTIMATESReporting and withholding1%Reporting, no withholding5%Little or no reporting55%
Share of income misreported, by how it is reported. Two published studies, drawn to one scale. Source: Kleven and co-authors, Econometrica 2011; US Internal Revenue Service, Publication 1415.

The same pattern appears in two unrelated studies. A randomised audit found income reported by a third party almost never misreported, and self-reported income misreported on a large scale. Tax-gap estimates for another tax system rank the regimes the same way.

It is a statement about evidence, not about any country. It is why the firm adds an independent measurement before it helps anyone enforce anything.

  • 0.3%Reported by a third party. Randomised audit.0.3%Evasion rate on income reported by third parties (employers, banks) in a randomised tax-audit experiment.Source: Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011. Open the publication ↗
  • 37%Self-reported. Same audit.37%Evasion rate on self-reported income in the same experiment.Source: Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011. Open the publication ↗
  • 1%Reporting and withholding. Tax-gap estimate.1%Net misreporting rate on income subject to substantial information reporting and withholding.Source: US Internal Revenue Service, Publication 1415, Tax Gap Estimates for Tax Years 2011 to 2013 (2019). Open the publication ↗
  • 5%Reporting, no withholding. Tax-gap estimate.5%Net misreporting rate on income subject to substantial information reporting without withholding.Source: US Internal Revenue Service, Publication 1415, Tax Gap Estimates for Tax Years 2011 to 2013 (2019). Open the publication ↗
  • 55%Little or no reporting. Tax-gap estimate.55%Net misreporting rate on income subject to little or no information reporting.Source: US Internal Revenue Service, Publication 1415, Tax Gap Estimates for Tax Years 2011 to 2013 (2019). Open the publication ↗

The two studies measure different things in different systems. They are shown on one scale to compare their order of magnitude, not to add them.

Delivery

A sector goes live in about 90 days because the programme is won before day one

The same three phases apply in every sector. Preparation happens at the developer's own cost and risk, before the contract takes effect. The day counts are illustrative.

The firm builds in the three phases of its mark. Develop carries the studies, structuring and financing. Build carries delivery to acceptance. Operate carries the service, the renewals and the hand-over.

Because Develop is done at the developer's own risk before the contract takes effect, Build starts with a platform that has already passed its release tests.

Concession terms are commonly 15 to 20 years Illustrative and assets, code and skills pass to the national owner at the end of the term.

DevelopBefore day oneStudiesStructuringFinancingBuildDays 1 to 901 to 3031 to 6061 to 90OperateAfter day 90OperationsRenewalsHand-overTIME FROM THE EFFECTIVE DATE
Schematic, not to scale. Day counts are typical phases. Illustrative
  1. Before day oneEntity, approvals, long-lead equipment, release one of the platform, staff training, interface tests.
  2. Days 1 to 30Data centres, first feeds, the academy opens.
  3. Days 31 to 60All sources feeding, parallel reconciliation against existing filings.
  4. Days 61 to 90Dashboards, first statements, acceptance.
  5. After day 90Steady operation, a renewal wave mid-term, a hand-over programme in the final years.

Search CFA Ventures

Type to search.