Insight · Delivery

Won before day one.
Live in about 90 days.

A national deployment goes live quickly because the preparation was finished before the contract took effect.

ContinueSchematic. Timings and proportions are illustrative.

The argument

A national go-live in 90 days is credible only because most of the work came before day one.

Show the line, then take away each half.

Ninety days is the visible part of a deployment, not the whole of it.

Below the line sits the work done at the developer's own cost and risk: the entity, the approvals, long-lead equipment, the platform and its first accepted release, trained staff and tested interfaces.

Above it, once the contract is effective, three milestones fall within about 90 days. All timings here are illustrative.

IllustrativeTimings are not a forecast and describe no engagement.

Instrument · above and below the line
Show

Seen from above. Three milestones in about 90 days, and no explanation of how they become reachable.

Seen from below. The work that makes the milestones reachable, finished before the contract takes effect.

Together. A deployment that is credible because its foundation already exists on day one.

Pre-effective preparation

Four conditions fill the record before the contract takes effect.

Each step lights one pane of the window cell, the mark of the sealed record.

Readiness at day zeroEntity establishedApprovals obtainedLong-lead equipment orderedSkids tested at the factoryPlatform builtRelease one acceptedStaff trainedInterfaces testedReady on day zerothe record is complete
01

The legal footing is in place.

The entity exists and the approvals are obtained. Work that depends on them can start without waiting for a signature that has not yet arrived.

02

Long-lead equipment is ordered.

Equipment with the longest delivery times is ordered early, and packaged as factory-tested skids, so that site work has nothing to wait for.

03

The platform exists and release one is accepted.

The data platform is built and the first release has passed acceptance. Source code, models and documentation are escrowed from that release.

04

People and interfaces are tested.

Staff are trained and the interfaces are exercised in test environments before the effective date. The record is complete when the clock starts.

The 90 days

The 90 days run in three parts, each with one purpose.

Choose a phase and read what is built, and how many sources are feeding.

The 90 days are short because the work inside them is narrow.

Each phase has one deliverable that the next phase depends on. Data centres and first feeds come before parallel reconciliation, and reconciliation comes before dashboards and statements. No step needs a decision that was not already taken before day zero.

Instrument · phases of the 90 daysIllustrative timings
Phase

Mobilisation. Teams mobilise and take an inventory of the existing sources and systems the deployment will read.

Days 1 to 30. The data centres come up, the first feeds arrive and the academy opens.

Days 31 to 60. All sources are feeding, and reconciliation runs in parallel against existing filings.

Days 61 to 90. Dashboards, the first statements and acceptance. Steady operation follows.

NoneFirstAllsources feeding
Not yetParallelAcceptedreconciliation

Who carries what

Before day zero the developer carries the cost. After it, the service pays only on proof.

Switch the side of the line.

Instrument · direction of moneySchematic
Side of day zero

Before. Everything in the preparation is funded by the developer, with no revenue to set against it. That is the cost of arriving with a working system.

After. Where the firm is paid from the service, it is paid only on a registered, verified record. An incomplete or out-of-tolerance event stays provisional and earns nothing. The state's share is paid first.

Prepared delivery moves risk to the party that controls it.

The developer controls the preparation, so the developer carries its cost and its risk. The service controls the record, so the fee follows the record.

The state does not pay for a system that is not yet running, and does not pay a fee for a record that was not verified.

Inspectable preparation

Six acceptance gates make the preparation something the owner can inspect.

Open a gate to read what it tests.

A gate is a point at which the owner can say no.

Gates are tested in sequence, so a failed gate stops the programme where the fault is, not at the end. Interface schedules name one supplier per interface and are backed by contract tests, which gives the owner something concrete to inspect before any money depends on it.

Instrument · acceptance gates A1 to A6
Gate

A1, interface. Each interface agrees with the schedule of its owner, with one named supplier per interface and contract tests behind it.

A2, component. Each component meets its specification on its own before it is combined with anything else.

A3, integration. The components work together in a test environment, ahead of the effective date where the programme allows.

A4, operational. The system runs under operating conditions with the operations team that will run it.

A5, service. The service reaches its users at the agreed level, with reporting the owner can read directly.

A6, transfer. Assets, code and skills pass to the national owner, after documented hand-over rehearsals.

IllustrativeWhich gates fall before the effective date depends on the programme.

Cut-over

The old basis keeps running until the authority chooses the new one.

Run both, then let the authority decide.

A parallel run turns a leap into a comparison.

During days 31 to 60 the new reconciliation runs beside the existing filings. Differences open exception cases, each routed to a named public owner.

Cut-over happens by parallel run, and only when the authority chooses the new basis. Until then nothing it relies on has been replaced.

Instrument · cut-overSchematic
State of the run

Parallel run. Both bases run. Where they differ, an exception case is opened for a named public owner.

New basis adopted. The authority, not the developer, chooses the moment. The old line stops there and the sealed record carries on.

After day 90

The 90 days are a sliver of a term that is commonly 15 to 20 years.

Both ranges are illustrative. The zoom shows the proportion.

Concession term, commonly 15 to 20 years (illustrative)renewal wave, mid-termhand-over programmeFirst 90 days, enlargedDays 1 to 30Days 31 to 60Days 61 to 90
Schematic. The upper bar is drawn to scale for a term of 15 years; a term of 20 years would make the sliver thinner. After day 90 comes steady operation, a renewal wave at mid-term and a hand-over programme in the final years.

What the 90 days buy is the start of steady operation, not the end of the work.

Operations centres, field crews, calibration on schedule and service-level reporting continue for the term. Preparation is what lets the term start with a working system instead of a plan.

Before the contract

Ask a bidder what is already built, tested and accepted.

Three places to test the claim.

A short deployment is a long preparation, made visible only after it is finished.