Service 04 of 07
Delivery is a run of proved gates.
Not a calendar.
Packaged procurement, factory-tested skids, parallel crews and gates A1 to A6, with the critical path always in view.
What is delivered
Packages run in parallel; proof runs in series.
We take a designed system from approved scope to one that is installed, verified by the competent body and ready to hand over.
Procurement is packaged so that every interface has one named supplier and one test. Skids are proved at the factory before they ship. Crews work node by node in parallel, and each node walks the same six states until the legal-metrology body has verified it.
The deliverable is not equipment on a quay. It is a system the owner can accept gate by gate, with one critical path to defend.
- OwnerSees every package, gate and slip on one schedule.
- RegulatorReceives verified nodes, not claims of installation.
- FinancierReleases funds against gates that were proved.
Method
Four moves take a package from paper to a gate that holds.
One schedule fixes who supplies what at every boundary
Each interface is numbered, with one supplier of record, one standard and one contract test. Nothing is built against an interface that has no owner.
Skids are tested before they travel
Equipment is assembled and tested in the factory with the owner's engineer present, so faults are found where they cost least. Pre-effective preparation at the developer's own risk puts long-lead equipment through this step before day one.
Crews run in parallel, one node at a time
A node is proposed, surveyed, designed, installed, verified by the legal-metrology body and commissioned. Installation never waits for another node's gate.
Six gates close in series
Interface, component, integration, operational, service and transfer. Each gate is signed by a named person, and the next one does not open until it has passed.
Instrument
A slip counts only when it sits on the critical path.
Choose a package and slip it. Bars, slack and the end of the programme recompute. Every duration is illustrative.
- Programme length
- 27 months
- Against plan
- +3 months
- On the critical path
- 7 of 11Mobilise, Long-lead orders, Factory tests, Installation, Integration, Operational gate, Transfer gate
Installation is on the critical path: every month it slips moves the end of the programme by a month, and the gate that follows cannot open early.
Programme timings are illustrative. A national deployment can go live in about 90 days once a contract is effective because preparation is finished before day one.
Acceptance
Six gates turn an installation into an accepted system.
Choose a gate to see what it proves, who signs it and which published standard it was designed against.
A1 · Interface
- What it proves
- Every numbered interface behaves as its contract says, on a test environment, before any equipment ships.
- Who signs
- The supplier of record and the owner's engineer.
- Evidence kept
- Contract-test reports per interface, with security zones and conduits reviewed against the published standard.
Designed against IEC 62443IEC 62443Security for industrial automation and control systems.Source: Standard body publication: IEC 62443. Open the publication ↗
A2 · Component
- What it proves
- Each component is correct alone: factory tests, witnessed proving, as-found and as-left records.
- Who signs
- The legal-metrology body for measurement equipment; the owner's engineer for the rest.
- Evidence kept
- Witnessed test records and calibration certificates, filed against the node.
Designed against OIML R 117-1:2019OIML R 117-1:2019Dynamic measuring systems for liquids other than water.Source: Standard body publication: OIML R 117-1:2019. Open the publication ↗
A3 · Integration
- What it proves
- Components work together on real feeds, and the first parallel reconciliation runs against existing filings.
- Who signs
- The integration lead and a named public officer.
- Evidence kept
- Link activation reports and the first reconciled periods.
Designed against ITU-T Y.1564ITU-T Y.1564Ethernet service activation test methodology.Source: Standard body publication: ITU-T Y.1564. Open the publication ↗
A4 · Operational
- What it proves
- The operations centre, field crews and procedures work, including failover under dual control.
- Who signs
- The operations manager and the owner's representative.
- Evidence kept
- Rehearsal logs, failover record, access review.
Designed against ISO/IEC 27001:2022ISO/IEC 27001:2022Information security management systems: requirements.Source: Standard body publication: ISO/IEC 27001:2022. Open the publication ↗
A5 · Service
- What it proves
- Service levels are measured on live telemetry the owner can read, and the first verified statement is issued.
- Who signs
- The independent verifier.
- Evidence kept
- The first statement with its evidence manifest.
A6 · Transfer
- What it proves
- Assets, code, documentation and skills can pass to the national owner, and the hand-over has been rehearsed.
- Who signs
- The national owner and the independent verifier.
- Evidence kept
- Hand-over rehearsal record, escrow confirmation, training register.
Rollout
Only commissioned nodes count towards the programme.
Thirty illustrative nodes move through the same six states in ten waves. Move the month to read the register.
- Started
- 30 of 30
- Proposed
- 0
- Surveyed
- 3
- Designed
- 12
- Installed
- 6
- Verified
- 3
- Commissioned
- 6
Deliverables
Every deliverable is tied to a gate, so nothing is accepted twice.
| Deliverable | A1 | A2 | A3 | A4 | A5 | A6 |
|---|---|---|---|---|---|---|
| Interface schedule | produced | produced | produced | |||
| Factory acceptance records | produced | |||||
| Node register | produced | produced | produced | |||
| Test-environment reports | produced | produced | ||||
| As-built dossier | produced | produced | ||||
| Operating procedures and runbooks | produced | produced | ||||
| Verified service statement | produced | |||||
| Hand-over rehearsal record | produced | |||||
| Acceptance certificate | produced | produced | produced | produced | produced | produced |
Each record is produced once, signed once and filed where the auditor can find it. The acceptance certificate is the only deliverable that spans every gate, and it is issued only when the six records beneath it exist.
Records are signed and time-stamped at creation. A correction is a new signed event, never an overwrite.
Measure
The checks are published standards, not private opinion.
No gate opens on a promise.
Dynamic measuring systems for liquids other than water
Designed against; not claimed as certified.
OIML R 117-1:2019Dynamic measuring systems for liquids other than water.Source: Standard body publication: OIML R 117-1:2019. Open the publication ↗Ethernet service activation test methodology
Designed against; not claimed as certified.
ITU-T Y.1564Ethernet service activation test methodology.Source: Standard body publication: ITU-T Y.1564. Open the publication ↗Security for industrial automation and control systems
Designed against; not claimed as certified.
IEC 62443Security for industrial automation and control systems.Source: Standard body publication: IEC 62443. Open the publication ↗Continue
Delivery hands over to the systems that stay.
Systems integration
The interface schedule that this programme builds against, and the contract test on each line.
Read the serviceService 05Operations and maintenance
What happens after gate A6: the shifts, the field crews and the readings the owner can check.
Read the serviceInstrumentDeployment planner
Lay out a programme of your own and see which phase carries the weight.
Open the instrument