Delivery is a run of proved gates.
Not a calendar.

Packaged procurement, factory-tested skids, parallel crews and gates A1 to A6, with the critical path always in view.

ContinueSchematic: illustrative programme, critical path in laterite.

What is delivered

Packages run in parallel; proof runs in series.

We take a designed system from approved scope to one that is installed, verified by the competent body and ready to hand over.

Procurement is packaged so that every interface has one named supplier and one test. Skids are proved at the factory before they ship. Crews work node by node in parallel, and each node walks the same six states until the legal-metrology body has verified it.

The deliverable is not equipment on a quay. It is a system the owner can accept gate by gate, with one critical path to defend.

  • OwnerSees every package, gate and slip on one schedule.
  • RegulatorReceives verified nodes, not claims of installation.
  • FinancierReleases funds against gates that were proved.
ProcurementFactoryFieldPlatformInterface scheduleA1InterfaceA2ComponentA3IntegrationA4OperationalA5ServiceA6TransferParallelIn series
Schematic. Parallel packages converge on one interface schedule, then pass six gates in series.

Method

Four moves take a package from paper to a gate that holds.

01 · PackageI-01Meter skid to flow computerone supplierI-02Flow computer to platformone supplierI-03Platform to authority registryone supplierI-04Platform to operations centreone supplier02 · Prove at the factorySkid 1witnessed, passedSkid 2witnessed, passedSkid 3witnessed, passedAs-found and as-left records are kept against each skid.03 · Install node by nodeProposedSurveyedDesignedInstalledVerifiedCommissionedOnly the last state counts.04 · Accept in seriesA1InterfaceA2ComponentA3IntegrationA4OperationalA5ServiceA6Transfer
STEP 01

One schedule fixes who supplies what at every boundary

Each interface is numbered, with one supplier of record, one standard and one contract test. Nothing is built against an interface that has no owner.

STEP 02

Skids are tested before they travel

Equipment is assembled and tested in the factory with the owner's engineer present, so faults are found where they cost least. Pre-effective preparation at the developer's own risk puts long-lead equipment through this step before day one.

STEP 03

Crews run in parallel, one node at a time

A node is proposed, surveyed, designed, installed, verified by the legal-metrology body and commissioned. Installation never waits for another node's gate.

STEP 04

Six gates close in series

Interface, component, integration, operational, service and transfer. Each gate is signed by a named person, and the next one does not open until it has passed.

Instrument

A slip counts only when it sits on the critical path.

Choose a package and slip it. Bars, slack and the end of the programme recompute. Every duration is illustrative.

Critical-path instrumentIllustrative
Package that slips
+3 months
0612182430Months from effective datePlan 24Mobilisation and inventoryLong-lead equipment orderscriticalFactory tests of skidscriticalCivil works and foundationsslack 2Platform build, release oneslack 5Field installation, node by nodecriticalInterface and component testsslack 5Integration with existing systemscriticalOperational acceptancecriticalTraining academy and rehearsalsslack 15Service acceptance and transferEnd 27
Programme length
27 months
Against plan
+3 months
On the critical path
7 of 11Mobilise, Long-lead orders, Factory tests, Installation, Integration, Operational gate, Transfer gate

Installation is on the critical path: every month it slips moves the end of the programme by a month, and the gate that follows cannot open early.

Programme timings are illustrative. A national deployment can go live in about 90 days once a contract is effective because preparation is finished before day one.

Acceptance

Six gates turn an installation into an accepted system.

Choose a gate to see what it proves, who signs it and which published standard it was designed against.

A1A2A3A4A5A6

A1 · Interface

What it proves
Every numbered interface behaves as its contract says, on a test environment, before any equipment ships.
Who signs
The supplier of record and the owner's engineer.
Evidence kept
Contract-test reports per interface, with security zones and conduits reviewed against the published standard.
Designed against IEC 62443IEC 62443Security for industrial automation and control systems.Source: Standard body publication: IEC 62443. Open the publication ↗

A2 · Component

What it proves
Each component is correct alone: factory tests, witnessed proving, as-found and as-left records.
Who signs
The legal-metrology body for measurement equipment; the owner's engineer for the rest.
Evidence kept
Witnessed test records and calibration certificates, filed against the node.
Designed against OIML R 117-1:2019OIML R 117-1:2019Dynamic measuring systems for liquids other than water.Source: Standard body publication: OIML R 117-1:2019. Open the publication ↗

A3 · Integration

What it proves
Components work together on real feeds, and the first parallel reconciliation runs against existing filings.
Who signs
The integration lead and a named public officer.
Evidence kept
Link activation reports and the first reconciled periods.
Designed against ITU-T Y.1564ITU-T Y.1564Ethernet service activation test methodology.Source: Standard body publication: ITU-T Y.1564. Open the publication ↗

A4 · Operational

What it proves
The operations centre, field crews and procedures work, including failover under dual control.
Who signs
The operations manager and the owner's representative.
Evidence kept
Rehearsal logs, failover record, access review.
Designed against ISO/IEC 27001:2022ISO/IEC 27001:2022Information security management systems: requirements.Source: Standard body publication: ISO/IEC 27001:2022. Open the publication ↗

A5 · Service

What it proves
Service levels are measured on live telemetry the owner can read, and the first verified statement is issued.
Who signs
The independent verifier.
Evidence kept
The first statement with its evidence manifest.

A6 · Transfer

What it proves
Assets, code, documentation and skills can pass to the national owner, and the hand-over has been rehearsed.
Who signs
The national owner and the independent verifier.
Evidence kept
Hand-over rehearsal record, escrow confirmation, training register.

Rollout

Only commissioned nodes count towards the programme.

Thirty illustrative nodes move through the same six states in ten waves. Move the month to read the register.

Node register, thirty nodesIllustrative
010203006121823Month from effective dateCommissionedVerifiedInstalledDesignedSurveyedProposed
Month 12
Started
30 of 30
Proposed
0
Surveyed
3
Designed
12
Installed
6
Verified
3
Commissioned
6

Deliverables

Every deliverable is tied to a gate, so nothing is accepted twice.

Deliverables against acceptance gates A1 to A6
DeliverableA1A2A3A4A5A6
Interface scheduleproducedproducedproduced
Factory acceptance recordsproduced
Node registerproducedproducedproduced
Test-environment reportsproducedproduced
As-built dossierproducedproduced
Operating procedures and runbooksproducedproduced
Verified service statementproduced
Hand-over rehearsal recordproduced
Acceptance certificateproducedproducedproducedproducedproducedproduced

Each record is produced once, signed once and filed where the auditor can find it. The acceptance certificate is the only deliverable that spans every gate, and it is issued only when the six records beneath it exist.

Records are signed and time-stamped at creation. A correction is a new signed event, never an overwrite.

Measure

The checks are published standards, not private opinion.

No gate opens on a promise.

ReadingTime stampSignerDigestSigned and time-stamped at creation.A correction is a new signed event.
Schematic. One sealed evidence cell per gate record.
OIML R 117-1:2019

Dynamic measuring systems for liquids other than water

Designed against; not claimed as certified.

OIML R 117-1:2019Dynamic measuring systems for liquids other than water.Source: Standard body publication: OIML R 117-1:2019. Open the publication ↗
ITU-T Y.1564

Ethernet service activation test methodology

Designed against; not claimed as certified.

ITU-T Y.1564Ethernet service activation test methodology.Source: Standard body publication: ITU-T Y.1564. Open the publication ↗
IEC 62443

Security for industrial automation and control systems

Designed against; not claimed as certified.

IEC 62443Security for industrial automation and control systems.Source: Standard body publication: IEC 62443. Open the publication ↗