How we deliver

No gate passed, no next phase.
Six gates, one record.

Six gates carry a programme from assessment to hand-back. Each closes only on evidence that a named officer can verify.

ContinueSchematic: six gates on one rail.

The gates

Six gates carry a programme, and none opens before the last is closed.

A gate is a cell with four conditions. Choose a gate to see what has passed and what closes it.

G1 AssessG2 DesignG3 FinanceG4 BuildG5 OperateG6 Transfer
Gate
Gate 1 of 6 · Develop

Assessment closes on a graded evidence register.

Demand and revenue are sized from public data and fees and models are benchmarked internationally. Every figure carries a grade and a source.

Closes on: An evidence register the authority can read.

Gate 2 of 6 · Develop

Design closes when every interface has one named supplier.

Definitive feasibility, system design and an interface schedule, with the open-book model published beside it and its sensitivities listed.

Closes on: An agreed interface schedule and an open-book model.

Gate 3 of 6 · Develop

Finance closes before the build begins.

Private equity with standby commitments, senior and local-currency debt and reserve accounts. Where the model uses one, an escrowed collection account in which the operator is not a signatory.

Closes on: Funding in place and the collection account opened.

Gate 4 of 6 · Build

Build closes site by site, then as a whole.

Each site is proposed, surveyed, designed, installed, verified by the legal-metrology body and commissioned. Then the integrated system is accepted against written tests.

Closes on: Every site commissioned and the system accepted.

Gate 5 of 6 · Operate

Operation closes on service levels the owner can read.

Operations centres run around the clock. Service levels, and any penalty, are computed from telemetry the owner reads directly. Calibration follows its schedule.

Closes on: Service accepted and reported from owner-readable telemetry.

Gate 6 of 6 · Operate

Transfer closes when the owner runs the system without us.

Assets, source code and skills pass to the national owner, free of charge, after documented hand-over rehearsals under a national managing director.

Closes on: The national owner in control, rehearsed and documented.


SpecifiedWritten criteria, agreed before the work

TestedAgainst those criteria, on the real system

WitnessedBy a party independent of the team

SignedBy a named public officer

A gate has four conditions. All four, or the gate stays open and the next phase waits.

Pre-effective preparation

A national deployment can go live in about 90 days because it is won before day one.

Illustrative timing: scroll through it. The long work happens first, at the developer's own cost and risk.

Illustrative timelinePre-effectiveDays 1 to 30Days 31 to 60Days 61 to 90Contract effectiveEntity, approvals, equipment,release one, training, testsSources feedingFirst statementsDashboards, statements, acceptance
IllustrativeTiming is the typical shape of a programme, not a promise.
Before day one

The system exists before the contract is effective.

The entity, approvals, long-lead equipment, the platform build and acceptance of release one, staff training and interface tests are done at the developer's own cost and risk. The contract becomes effective on a system that already passes.

Days 1 to 30 · illustrative

Data centres stand up and the first feeds connect.

Primary and recovery sites are commissioned in country, the first sources begin to feed, and the training academy opens.

Days 31 to 60 · illustrative

Every source feeds, and the old basis keeps running.

All sources are feeding. Reconciliation runs in parallel against existing filings. Nobody is asked to switch yet, and every variance becomes a case.

Days 61 to 90 · illustrative

Dashboards, first statements, acceptance.

The first verified statements are issued and the service is accepted. Steady operation begins, with a renewal wave planned for mid-term.

Node gates

Every site climbs the same six steps, and crews climb in parallel.

Drag the week. Each row is a site; each column is a gate; a site cannot skip one.

13
Week 0Week 26
ProposedSurveyedDesignedInstalledVerifiedCommissioned
Site 1
Site 2
Site 3
Site 4
Site 5
Site 6
Site 7
Site 8
Site 9
Gate passedIn progressNot startedVerified means verified by the legal-metrology body.
13programme week
1of 9 sites commissioned
28of 54 site gates passed

Illustrative9 sites, 3 crews, gate durations and starts are illustrative inputs, not a plan.

Parallel run and cut-over

The old basis stays official until the authority chooses the new one.

Reconciliation runs beside the existing filing and the gap closes case by case. The authority names the day.

Measured by the independent chainDeclared in the existing filingthe gapOpen exception cases, falling as variances closeExisting filing is officialReconciled statement is officialDay 60Day 31Day 60Day 90
IllustrativeSchematic of a parallel run. The shapes carry no measured result.
Day 60
Day 31Day 90

Until day 60 the existing filing is the official basis. From day 60 the reconciled statement is. Both run in parallel until then.

The authority chooses the basis. We prepare the evidence and propose; a named public officer decides.

Acceptance

Acceptance is six tests, and each one needs a witness.

A1 to A6 run inside the gates. Build closes on the first three, operation on the next two, transfer on the last.

A1InterfaceA2ComponentA3IntegrationA4OperationalA5ServiceA6TransferBuildOperateTransfer
  1. A1InterfaceEvery interface in the schedule tested against its named supplier.
  2. A2ComponentEach component passes factory and site tests before it is installed.
  3. A3IntegrationComponents work together and with the state systems they join.
  4. A4OperationalThe operations centre runs the system on live feeds.
  5. A5ServiceService levels are met and reported from telemetry.
  6. A6TransferThe national owner can run it: assets, code and skills.

Renewal and hand-back

The term is planned from its first day to end in a rehearsed hand-back.

Concession terms commonly run 15 to 20 years (an illustrative range). Choose a term to see where the renewal wave and the hand-over programme fall.

18 years
15 years20 years
Renewal waveYear 9Hand-over programmeFrom year 14DeploymentYear 0Hand-back, year 18Steady operation, calibration on schedule, service-level reporting
IllustrativeThe term, the mid-term wave and the final fifth are illustrative proportions, not a contract.

For an illustrative 18 year term: a renewal wave around year 9, the hand-over programme from about year 14, and the hand-back at year 18.