Services · seven lines, one chain
Seven services,
one chain from study to hand-back.
CFA Ventures develops, finances, builds and operates the backbone of sovereign and infrastructure projects. The seven services are the same chain seen from seven positions, and each one hands its record to the next.
The model
A project fails at its seams, so one firm holds all three phases
Develop, Build and Operate are the three slabs of the mark. Choose a phase to see which services carry it.
- 01Project developmentStudies, models and dossiers that a hostile reader can reproduce.
- 02Infrastructure financeEquity, standby equity, mezzanine and senior debt, ranked and sized.
- 03Concessions and PPPBOT and DFBOT structures with the State share paid first.
- 04Construction and deliveryPackaged procurement, factory-tested skids and six acceptance gates.
- 05Systems integrationOne named supplier per interface, contract tests, parallel-run cut-over.
- 06Operations and maintenance24/7 centres, calibration on schedule, service levels read from telemetry.
- 07Audit and assuranceIndependent audits with published confidence intervals; gaps labelled, never interpolated.
How a service hands over
Each service ends by handing something checkable to the next
The dossier is the first product
Studies and models are written so that a lender, a regulator and a rival bidder can each reproduce the numbers from one evidence register.
Money is placed before the first trench
Equity, standby equity and debt are sized against the concession. The State's share is paid first, from an escrowed account the operator does not sign.
Build is gated, not promised
Each node moves from proposed to commissioned. Six acceptance gates, A1 to A6, stand between delivery and any fee.
The term ends with the keys
Operations run to service levels, auditors test the record, and assets, code and skills pass to the national owner without charge.
Seven questions
Each service answers one question a minister asks
Open the one that matches the decision on your desk.
- 01Is it worth doing, and on what evidence?Project development
- 02Who pays, and in what order?Infrastructure finance
- 03Who carries which risk?Concessions and PPP
- 04Will it be built to the interface schedule?Construction and delivery
- 05Do the parts work as one system?Systems integration
- 06Who runs it, and to what service level?Operations and maintenance
- 07Who checks the record?Audit and assurance
Who it is for
Four kinds of reader use the same seven services differently
Governments, regulators, infrastructure owners and lenders each read a different part of the chain. Choose a reader.
| Service | Governments | Regulators | Owners | Lenders |
|---|---|---|---|---|
| Project development | ||||
| Infrastructure finance | ||||
| Concessions and PPP | ||||
| Construction and delivery | ||||
| Systems integration | ||||
| Operations and maintenance | ||||
| Audit and assurance |
Governments want a project they can defend in public: the State's share first, a competitive route for rivals, and the keys returned at the end.
Regulators want a second evidence chain that reads copies and never writes into an operator's systems. A named public officer decides.
Infrastructure owners want a build to an interface schedule and an operation whose service levels they can read for themselves.
Lenders want revenue that is registered before it is paid, ranked layers of capital and a record that an auditor can replay.
Why the record comes first
Revenue that a third party reports is almost always declared
That is the economic case for the independent chain that runs through all seven services. The evidence is on income tax compliance; it is cited here as the principle, not as a finding about any sector.
Evasion rate on income reported by third parties (employers, banks) in a randomised tax-audit experiment
Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011
0.3%Evasion rate on income reported by third parties (employers, banks) in a randomised tax-audit experiment.Source: Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011. Open the publication ↗Evasion rate on self-reported income in the same experiment
Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011
37%Evasion rate on self-reported income in the same experiment.Source: Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011. Open the publication ↗Sources: 0.3%Evasion rate on income reported by third parties (employers, banks) in a randomised tax-audit experiment.Source: Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011. Open the publication ↗37%Evasion rate on self-reported income in the same experiment.Source: Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011. Open the publication ↗1%Net misreporting rate on income subject to substantial information reporting and withholding.Source: US Internal Revenue Service, Publication 1415, Tax Gap Estimates for Tax Years 2011 to 2013 (2019). Open the publication ↗5%Net misreporting rate on income subject to substantial information reporting without withholding.Source: US Internal Revenue Service, Publication 1415, Tax Gap Estimates for Tax Years 2011 to 2013 (2019). Open the publication ↗55%Net misreporting rate on income subject to little or no information reporting.Source: US Internal Revenue Service, Publication 1415, Tax Gap Estimates for Tax Years 2011 to 2013 (2019). Open the publication ↗ Rates are as published; no rate is converted or combined.
The gradient is the argument. The more a third party reports an income, the less of it is evaded.
Our chains put that third party where none exists today: at the meter, the gate, the switch and the ledger, beside the operator and never inside it.
A state can only govern what it can measure.
The delivery model
A national deployment can go live in about 90 days because it is won before day one
Preparation happens at the developer's own cost and risk before the contract is effective. Move the marker along the illustrative timeline.
Ninety days after the effective date
IllustrativeDays 1 to 30Data centres stand up, the first feeds arrive and the academy opens.
The 90 days and the three windows are the firm's illustrative delivery model, not a commitment for any programme.