Energy that is metered can be billed.
Follow it down the feeder.

Between substation and customer, energy is lost to the wire and to the gap between delivered and billed. We design the metering that tells them apart.

ContinueSchematic. Shares and losses illustrative.

The stakes

Unbilled energy is the grid's missing investment.

Energy delivered and not billed is revenue a network cannot reinvest. The access gap is where that cost lands.

One square per percent of the population. Lit squares: about 43 percent, without access.600 millionPeople in Africa without access to electricity, about 43 percent of the population.Source: International Energy Agency, Africa Energy Outlook 2022. Open the publication ↗
600 million

People in Africa without access to electricity, about 43 percent of the population

International Energy Agency, Africa Energy Outlook 2022

600 millionPeople in Africa without access to electricity, about 43 percent of the population.Source: International Energy Agency, Africa Energy Outlook 2022. Open the publication ↗

A utility that cannot see which of its feeders leak cannot show a lender where an extension will pay for itself.

The mechanism

Two kinds of loss hide in one number, and only one of them is physics.

Technical loss is heat in wires and transformers, and it can be computed. Commercial loss is energy delivered and not paid for. Meter both and the gap has an address.

Feeder balance, one month Illustrative

1,000 MWh
12%
7%
100
Billed
810MWh
Technical loss
120MWh
Commercial loss
70MWh
Unbilled value
7,000units
1,000 MWhEnergy in12%Technical7%Commercial81%BilledEach column is a share of the energy in.
IllustrativeSchematic. A balance with defaults chosen for illustration, not measurements of any network. Move the sliders and the columns settle on the same energy in.

A meter at the feeder head shows only the sum of the two. Meters at transformers and customers give each part an address.

One feeder

Three layers of metering turn a loss into a named transformer.

Follow 100 units of energy from the substation. The units are illustrative.

Illustrative unitsSubstation100M1T13432−2T23230−2T32819−9−6 on the linecomputed physicsunexplainedCase on T3, routed to a named utility officer

Layer 1 of 3

The feeder head is metered first.

One meter at the substation says how much energy enters the feeder. Alone, it says how much left, and never where it went.

Energy in: 100 units Illustrative

Layer 2 of 3

Transformer meters give the loss its first address.

Metered at each distribution transformer, 94 of the 100 units arrive. The missing 6 are lost on the line between the head and the transformers.

Arriving: 34, 32 and 28 units Illustrative

Layer 3 of 3

Customer meters close the balance below each transformer.

Billed energy can now be set against what each transformer delivered. Two of the three branches lose 2 units. The third loses 9.

Billed: 32, 30 and 19 units Illustrative

Computed, not assumed

Technical loss is calculated from the network.

Line resistance, load and transformer ratings give the physical loss of each branch. What remains after it is commercial: energy delivered that nobody paid for.

Third branch: 2 computed, 7 unexplained Illustrative

An owner for the finding

The unexplained part becomes a case with a name on it.

The engine proposes an exception for the third transformer. A named utility officer decides, a field crew inspects, and the result is sealed to the record.

What we build

Five capabilities, one evidence chain from generation to the customer.

Each reads copies of the utility's own data. None writes into its control systems.

GenerationStationPrepaidPrepaidPrepaidBalance per feederCase, named ownerfield crew, sealed record

Grid and feeder metering

Gateways read the meters that exist.

A gateway reads existing feeder and transformer meters first. New hardware goes in only where a witnessed test shows a gap, and each node passes a gate before it counts.

Prepaid metering integration

Prepaid sales join the balance.

Prepaid platforms are connected through documented, revocable interfaces, so tokens sold and energy delivered sit in the same record as every other meter.

Loss analytics

A balance per feeder, every day.

The reconciliation engine compares energy in with energy billed, branch by branch, separates the computed technical part and ranks what remains by size.

Utility revenue protection

Every variance has a named owner.

A variance opens an exception case routed to a public or utility officer. Field crews work it offline on a signed record. The system proposes and a person decides.

Generation and transmission

Project development behind the meters.

Feasibility studies, financial models and concession or partnership structuring for generation and transmission, built on the same evidence base as the metering.

Financing and delivery

The investment need is large, and the financing gap sits inside it.

Where the service pays for itself, capital can be raised against its own record, without a state guarantee.

  • Annual infrastructure investment needsEstimate for Africa

    USD 130bn to 170bnUSD 130bn to 170bnEstimated annual infrastructure investment needs of Africa.Source: African Development Bank, African Economic Outlook 2018. Open the publication ↗
  • Annual infrastructure financing gapEstimate for Africa

    USD 68bn to 108bnUSD 68bn to 108bnEstimated annual infrastructure financing gap of Africa.Source: African Development Bank, African Economic Outlook 2018. Open the publication ↗

Bars share one scale, zero to 180 billion US dollars. Each bar spans the published range, not a point.

The stack combines private equity with standby commitments, senior and local-currency debt, reserve accounts, local investor tranches, and development-finance and export-credit routes. Where the firm is paid from the service, it is paid per registered unit and the state's share is paid first.

Proposed1Surveyed2Designed3Installed4Verified5Commissioned6
Designed

Proposed.

The node enters the programme with its feeder, its owner and its metering need.

Surveyed.

A crew confirms the site, the existing meter and the interface that will carry its readings.

Designed.

The interface schedule names one supplier per interface, with a contract test for each.

Installed.

Equipment is fitted, factory-tested skids first, by parallel crews.

Verified.

The legal-metrology body verifies the meter. Until it has, readings stay provisional and earn no fee.

Commissioned.

The node joins the record, and the fee starts on registered units only.

Standards

Metering, grid communication and security each follow a published standard.

Standards we design against. None is claimed as a certification.

IEC 62056 seriesIEC 62056 seriesElectricity metering data exchange: the DLMS/COSEM suite.Source: Standard body publication: IEC 62056 series.

Electricity metering data exchange: the DLMS/COSEM suite.

Meter data exchange
IEC 62052 and IEC 62053 seriesIEC 62052 and IEC 62053 seriesElectricity metering equipment: general and particular requirements.Source: Standard body publication: IEC 62052 and IEC 62053 series.

Electricity metering equipment: general and particular requirements.

Metering equipment
IEC 61850IEC 61850Communication networks and systems for power utility automation.Source: Standard body publication: IEC 61850.

Communication networks and systems for power utility automation.

Substation communication
IEC 62443IEC 62443Security for industrial automation and control systems.Source: Standard body publication: IEC 62443. Open the publication ↗

Security for industrial automation and control systems.

Control-system security
ISO/IEC 27001:2022ISO/IEC 27001:2022Information security management systems: requirements.Source: Standard body publication: ISO/IEC 27001:2022. Open the publication ↗

Information security management systems: requirements.

Information security
ISO/IEC 17025:2017ISO/IEC 17025:2017General requirements for the competence of testing and calibration laboratories.Source: Standard body publication: ISO/IEC 17025:2017. Open the publication ↗

General requirements for the competence of testing and calibration laboratories.

Calibration laboratories
OpenAPI 3.1OpenAPI 3.1OpenAPI Specification for describing HTTP interfaces.Source: Standard body publication: OpenAPI 3.1. Open the publication ↗

OpenAPI Specification for describing HTTP interfaces.

Published interfaces
W3C WebAuthnW3C WebAuthnWeb Authentication: phishing-resistant sign-in with public-key credentials.Source: Standard body publication: W3C WebAuthn. Open the publication ↗

Web Authentication: phishing-resistant sign-in with public-key credentials.

Phishing-resistant sign-in

Search CFA Ventures

Type to search.