Grid and feeder metering
Gateways read the meters that exist.
A gateway reads existing feeder and transformer meters first. New hardware goes in only where a witnessed test shows a gap, and each node passes a gate before it counts.
Sector 08 of 12
Between substation and customer, energy is lost to the wire and to the gap between delivered and billed. We design the metering that tells them apart.
The stakes
Energy delivered and not billed is revenue a network cannot reinvest. The access gap is where that cost lands.
People in Africa without access to electricity, about 43 percent of the population
International Energy Agency, Africa Energy Outlook 2022
600 millionPeople in Africa without access to electricity, about 43 percent of the population.Source: International Energy Agency, Africa Energy Outlook 2022. Open the publication ↗A utility that cannot see which of its feeders leak cannot show a lender where an extension will pay for itself.
The mechanism
Technical loss is heat in wires and transformers, and it can be computed. Commercial loss is energy delivered and not paid for. Meter both and the gap has an address.
Feeder balance, one month Illustrative
A meter at the feeder head shows only the sum of the two. Meters at transformers and customers give each part an address.
One feeder
Follow 100 units of energy from the substation. The units are illustrative.
Layer 1 of 3
One meter at the substation says how much energy enters the feeder. Alone, it says how much left, and never where it went.
Energy in: 100 units Illustrative
Layer 2 of 3
Metered at each distribution transformer, 94 of the 100 units arrive. The missing 6 are lost on the line between the head and the transformers.
Arriving: 34, 32 and 28 units Illustrative
Layer 3 of 3
Billed energy can now be set against what each transformer delivered. Two of the three branches lose 2 units. The third loses 9.
Billed: 32, 30 and 19 units Illustrative
Computed, not assumed
Line resistance, load and transformer ratings give the physical loss of each branch. What remains after it is commercial: energy delivered that nobody paid for.
Third branch: 2 computed, 7 unexplained Illustrative
An owner for the finding
The engine proposes an exception for the third transformer. A named utility officer decides, a field crew inspects, and the result is sealed to the record.
What we build
Each reads copies of the utility's own data. None writes into its control systems.
Grid and feeder metering
A gateway reads existing feeder and transformer meters first. New hardware goes in only where a witnessed test shows a gap, and each node passes a gate before it counts.
Prepaid metering integration
Prepaid platforms are connected through documented, revocable interfaces, so tokens sold and energy delivered sit in the same record as every other meter.
Loss analytics
The reconciliation engine compares energy in with energy billed, branch by branch, separates the computed technical part and ranks what remains by size.
Utility revenue protection
A variance opens an exception case routed to a public or utility officer. Field crews work it offline on a signed record. The system proposes and a person decides.
Generation and transmission
Feasibility studies, financial models and concession or partnership structuring for generation and transmission, built on the same evidence base as the metering.
Financing and delivery
Where the service pays for itself, capital can be raised against its own record, without a state guarantee.
Annual infrastructure investment needsEstimate for Africa
USD 130bn to 170bnUSD 130bn to 170bnEstimated annual infrastructure investment needs of Africa.Source: African Development Bank, African Economic Outlook 2018. Open the publication ↗Annual infrastructure financing gapEstimate for Africa
USD 68bn to 108bnUSD 68bn to 108bnEstimated annual infrastructure financing gap of Africa.Source: African Development Bank, African Economic Outlook 2018. Open the publication ↗Bars share one scale, zero to 180 billion US dollars. Each bar spans the published range, not a point.
The stack combines private equity with standby commitments, senior and local-currency debt, reserve accounts, local investor tranches, and development-finance and export-credit routes. Where the firm is paid from the service, it is paid per registered unit and the state's share is paid first.
The node enters the programme with its feeder, its owner and its metering need.
A crew confirms the site, the existing meter and the interface that will carry its readings.
The interface schedule names one supplier per interface, with a contract test for each.
Equipment is fitted, factory-tested skids first, by parallel crews.
The legal-metrology body verifies the meter. Until it has, readings stay provisional and earn no fee.
The node joins the record, and the fee starts on registered units only.
Standards
Standards we design against. None is claimed as a certification.
Electricity metering data exchange: the DLMS/COSEM suite.
Meter data exchangeElectricity metering equipment: general and particular requirements.
Metering equipmentCommunication networks and systems for power utility automation.
Substation communicationSecurity for industrial automation and control systems.
Control-system securityInformation security management systems: requirements.
Information securityGeneral requirements for the competence of testing and calibration laboratories.
Calibration laboratoriesOpenAPI Specification for describing HTTP interfaces.
Published interfacesWeb Authentication: phishing-resistant sign-in with public-key credentials.
Phishing-resistant sign-inContinue
Three ways on.
The same logic with water: a balance that must close, district by district.
Open the page ↗InstrumentSet two records against each other and read the value of the gap.
Open the instrument ↗ServiceThe capital stack behind a network that can bill what it delivers.
Open the page ↗