Insight 03 of 06 · Contracts
Pay on proof.
No record, no fee.
Where the firm is paid from the service, it is paid only on a registered, verified record. An incomplete or out-of-tolerance event stays provisional and earns nothing, and the state's share is paid first.
The principle
A fee attaches to a registered record, never to effort
Every event follows one path, and only one end of it pays.
A fee that follows effort rewards activity. A fee that follows records rewards evidence. Only the second is something a public authority can verify, because a registered record can be opened, replayed and challenged.
Each event is captured at the edge, checked for completeness, checked against its uncertainty budget, sealed, and registered. Only at the end of that path does a fee fall due, and it falls due per registered unit.
An event that fails a check is not forced through and does not disappear. It stays provisional: kept, visible, counted as provisional, and earning nothing until a signed correction completes it. A record that fails its signature or its sequence is rejected outright.
The record
A fee-bearing record fills four quadrants, one check at a time
The four cells of the firm's mark are the four checks a record passes.
Complete
Every signal the record needs is present. A missing signal is never guessed: the record stays provisional, and the gap is shown to the authority rather than filled in.
In tolerance
The uncertainty budget sits inside the legal limit. An over-limit or incomplete budget holds the registration. The test is a limit, not a score.
Sealed
Signed and time-stamped at creation by a device-bound key. A failure of signature or sequence is rejected, so no one can improve a record after the fact.
Registered
Reconciled and written to the evidence ledger under one event identifier. Now, and only now, a fee falls due on this unit, and it falls due once.
The gate
A record registers only if its combined uncertainty sits inside the legal limit
Seven components, combined by root sum of squares, against one limit.
The metrology engine keeps an uncertainty budget for every measurement: meter factor, temperature, pressure, density, sampling, proving and timing. The components are combined by root sum of squares and compared with the legal limit. An over-limit or incomplete budget holds the registration.
The limit used here is the maximum permissible error of an accuracy class 0.3 dynamic liquid measuring system, 0.3%0.3%Maximum permissible error of an accuracy class 0.3 dynamic liquid measuring system (custody transfer of crude oil and products).Source: OIML R 117-1:2019, Dynamic measuring systems for liquids other than water. Open the publication ↗. Within that class the meter alone is held to 0.2%0.2%Maximum permissible error of the meter alone in the same accuracy class.Source: OIML R 117-1:2019, Dynamic measuring systems for liquids other than water. Open the publication ↗.
The gate is binary on purpose. A record near the limit is not paid by degree: it is inside or it is held, and an auditor can check which. The component values in the instrument are illustrative.
Uncertainty budget, Illustrative
Inside the limit. The registration proceeds to the seal and the ledger.Over the limit. The registration is held, the record stays provisional and earns nothing.
Illustrative component values. Only the limit is a published figure.
The order of payment
The state's share is paid first, and the fee is paid from what remains
Money moves in a fixed order through an escrowed account in which the operator is not a signatory.
Collections enter an escrowed collection account. The state's share is paid first. The performance fee is paid from what remains, per registered unit and against published KPIs. Upside above a reference trajectory is shared.
The operator never holds public money, and a fee never leads the state's share. Where records are provisional there is nothing to pay on them, so the operator's incentive is to complete the evidence, not to push volume.
The terms are set per concession. The proportions drawn here are illustrative, and no fee level of any proposal is published on this site.
IllustrativeProportions are drawn, not quoted. No real terms are shown.
The incentive
An unregistered record costs the operator its fee, never the state its share
Move the registered share and read what is earned and what is not.
Records that are captured but not registered still count: they appear in the evidence, in the reports and in the exception cases, labelled provisional. They simply do not enter the fee base.
That puts the cost of weak evidence on the party that controls it. The operator of the second chain owns the sensors, the seals and the completeness of the record, so it carries the risk of an incomplete one. The state's share does not depend on this fee: it is paid first.
Try it with invented numbers. The units are illustrative and stand for no currency.
Fee at stake, Illustrative
Illustrative inputs. No real volume, fee or currency is shown.
The exceptions
Four things keep a record from earning a fee, and each leaves a trace
Choose a failure to see what happens to the record and what clears it.
Choose a failure
A signal is missing
- 01What happens. The record stays provisional: kept, visible and counted as provisional.
- 02What clears it. It clears when the missing signal is supplied, or the gap is explained in a signed correction with a second approver.
The budget exceeds the limit
- 01What happens. The registration is held. The record is neither forced through nor discarded.
- 02What clears it. It clears when the cause is found, for example at the next witnessed proving, and a signed correction is approved by a second team.
The signature check fails
- 01What happens. The record is rejected, so it can never enter the fee base.
- 02What clears it. Nothing clears it. A fresh, correctly sealed reading is a new record with a new identifier.
The sequence has a gap or a replay
- 01What happens. The record is rejected, and the missing or replayed message exposes itself to the authority.
- 02What clears it. Replay from the local buffer restores the missing messages; each arrives as a new, correctly sequenced record.
The boundary
Systems prepare and propose; a named public officer decides
A fee on proof is acceptable to a public authority because the firm is paid for evidence, never for outcomes.
The operator never assesses, collects, seizes, licenses or enforces, and never holds public money. The firm's systems capture, reconcile and propose. Every variance opens an exception case routed to a named public owner, and no algorithm may approve an adjustment.
Detection and risk models follow the same rule: the model proposes, a trained analyst decides, a public officer acts. Models are versioned and monitored for drift, blind-tested by an independent auditor, and their detection and false-alarm rates are published. No accuracy figure is claimed before it has been measured.
Pay on proof therefore pays for the part of the chain the firm controls, and leaves the part the state controls where it belongs.
Schematic. A filled cell is what a party does; the dotted line is the boundary the operator never crosses.
Take it further
From the principle to a waterfall, a budget and a contract
Three ways on, each a real page.
Concession waterfall
Follow money through an escrowed account, state share first, with your own inputs.
Uncertainty budget
Combine measurement components against a legal limit and see whether a record would register.
Concessions and PPP
Build-operate-transfer structures with performance-at-risk fees and free hand-back.