Potential case 01 · Oil and gas
One ledger for every crossing.
Online, node by node.
An illustrative structure built from public evidence and our delivery model. In this illustration ten nodes come online over six months, each measured at its own boundary. It describes no client and no engagement.
1 · The situation
Hydrocarbon revenue is only as firm as its weakest boundary reading.
Public evidence is consistent: what a third party measures is declared, and what a party reports about itself often is not.
A state sees a barrel where it is declared, not where it moves. Every crude export, import, product movement, bunker delivery and pipeline-gas transfer crosses a boundary, and each crossing carries up to three readings: ship, shore and tank.
Where those readings sit with one party, they are declared. Where a second chain reads copies, they are measured.
Estimated export under-invoicing of extractive commodities from Africa in 2015
UNCTAD, Economic Development in Africa Report 2020
USD 40bnEstimated export under-invoicing of extractive commodities from Africa in 2015.Source: UNCTAD, Economic Development in Africa Report 2020. Open the publication ↗Evasion rate on self-reported income in the same experiment
Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011
37%Evasion rate on self-reported income in the same experiment.Source: Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011. Open the publication ↗Evasion rate on income reported by third parties (employers, banks) in a randomised tax-audit experiment
Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011
0.3%Evasion rate on income reported by third parties (employers, banks) in a randomised tax-audit experiment.Source: Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011. Open the publication ↗The two evasion rates come from a randomised audit experiment on income. They show how the structure of reporting changes behaviour; they are not an estimate for any sector.
2 · The design
Three readings of one crossing become one record.
Ship, shore and tank figures are read as three readings of the same event and joined by one identifier.
Step 1
The crossing is metered twice.
A master meter and an independent flow computer recompute net standard volume from duplicated transmitter signals, at reference conditions of 15 °C and 101.325 kPa.15 °C and 101.325 kPaStandard reference conditions for petroleum and liquid petroleum products.Source: ISO 5024:1999, Petroleum liquids and liquefied petroleum gases, measurement, standard reference conditions. Open the publication ↗
Step 2
A second chain reads copies.
The operator keeps its meters. We add an independent chain beside them, reading copies through one-way data diodes. It never writes into an operator's control system.
Step 3
Ship, shore and tank are compared.
Bill of lading, outturn and tank gauge are three readings of one crossing. A variance opens an exception case routed to a named public owner.
Step 4
One identifier closes the crossing.
The identifier joins meter, quantity, quality, time, cargo, declaration, certificate, invoice and payment. It is a join key, never a verdict.
3 · The deployment plan
Ten nodes can come online in six months, one gate at a time.
Illustrative rollout: the first boundary crossings go live first, and depots and borders follow as the evidence chain extends inland.
Each node passes six gates: proposed, surveyed, designed, installed, verified by the legal-metrology body, commissioned. Equipment is procured as one package with common interface schedules, factory-tested skids and parallel crews, so nodes do not wait on one another.
- Nodes online
- 10of 10
- Offshore
- 2of 2
- Terminal
- 2of 2
- Depot
- 4of 4
- Border
- 2of 2
Swipe sideways to see the whole diagram.
Work spans by node family. Laterite dots mark the month each node is commissioned.
IllustrativeSchematic. Move the month: each node switches on in the month it comes online.
Six gates, passed in order by every node
- 1Proposed
- 2Surveyed
- 3Designed
- 4Installed
- 5Verified
- 6Commissioned
The fifth gate is passed only when the legal-metrology body has verified the node.
4 · The financing structure
The service pays for itself, and the state is paid first.
Illustrative: a fee fixed per registered unit, paid from an escrowed collection account to which the operator is not a signatory.
No record, no fee. A crossing that is incomplete or out of tolerance stays provisional and earns nothing. Choose an event state to see where the fee stands.
Registered
The record is complete and within tolerance. The fee accrues, after the state's share.
Provisional
The record is incomplete. No fee accrues until the record is complete and registered.
Out of tolerance
No fee accrues, and the event opens an exception case with a named public owner.
Funding routes, illustrative
- Private equity with standby commitments
- Senior and local-currency debt
- Reserve accounts
- Local investor tranches
- Development-finance and export-credit routes
Swipe sideways to see the whole diagram.
IllustrativeOrder of payment only; no amounts. No state guarantee is required where the service pays for itself.
5 · Governance
Whoever configures a meter never reconciles or certifies its volume.
Systems prepare evidence and propose. A named public officer decides. Choose an actor to see its column.
Field team
The field team configures meters. It may never reconcile volumes or issue certificates.
Analyst team
The analyst team reconciles volumes. It never configures meters.
Certificate team
The certificate team issues certificates. It never configures meters.
Public officer
The public officer decides each case and each adjustment. Systems prepare the evidence; the officer decides.
An algorithm
The an algorithm compares and proposes. It may never approve an adjustment or decide a case.
Swipe sideways to see the whole diagram.
Separation of duties. No standing administrator rights to ledger data; elevation is time-limited and recorded.
6 · What would be measured
An uncertainty budget decides whether a crossing may be registered.
Terms combine by root sum of squares and the total is compared with the legal limit. An over-limit or incomplete budget holds the registration.
Uncertainty terms, per cent of reading Illustrative
For a crossing of accuracy class 0.3, the system as a whole may err by at most 0.3%0.3%Maximum permissible error of an accuracy class 0.3 dynamic liquid measuring system (custody transfer of crude oil and products).Source: OIML R 117-1:2019, Dynamic measuring systems for liquids other than water. Open the publication ↗, and the meter alone by 0.2%0.2%Maximum permissible error of the meter alone in the same accuracy class.Source: OIML R 117-1:2019, Dynamic measuring systems for liquids other than water. Open the publication ↗. Set the terms, mark one unknown, and watch the registration hold.
Within the limit: the crossing may be registered.
- Combined (RSS)
- 0.146%
- Limit, class 0.3
- 0.3%0.3%Maximum permissible error of an accuracy class 0.3 dynamic liquid measuring system (custody transfer of crude oil and products).Source: OIML R 117-1:2019, Dynamic measuring systems for liquids other than water. Open the publication ↗
- Headroom
- 0.154% of headroom
Share of the combined variance, by term Illustrative
Registered share
Events registered divided by events metered, per node and per month.
Unit: per cent of eventsUncertainty against the limit
Combined uncertainty of each crossing against its legal limit.
Unit: per cent of volumeReconciled within tolerance
Share of volume where ship, shore and tank agree within their stated tolerances.
Unit: per cent of volumeException ageing
Open exception cases by age, each routed to a named public owner.
Unit: days openProving drift
As-found against as-left error at each witnessed proving.
Unit: per cent of readingStatement punctuality
Monthly statements issued by their due date.
Unit: statements on timeSix indicators, defined here. No value is claimed before it is measured.
7 · Risks and mitigations
Each risk sits at one stage of the chain, and each stage has its own control.
Stage: Field
Meter drift
Calibration on schedule, witnessed proving with as-found and as-left records, and duplicated transmitters feeding an independent flow computer.
Stage: Edge
Unreadable gauge
Gateways read existing tank gauges first, portable verification kits fill the gaps, and new hardware is fitted only where a witnessed test shows a gap.
Stage: Transport
Lost link
VSAT or LTE backhaul with a UPS in rugged enclosures, and local buffering so that records replay when the link returns.
Stage: Ledger
Altered record
A write-once raw store, hash-chain integrity checks and daily sealed hashes. Corrections are new signed events with a second approver.
Stage: Engines
Rule change
Every rule change creates a new dated version with a reference-case test suite. No algorithm may approve an adjustment.
Stage: Officer
Disputed reading
A provenance drawer on every figure, a query clock for the operator, and any month replayable in isolation from its evidence manifest.
8 · Where to go next
Follow the case into the sector, the delivery model and the technology.
Next potential casePrecious-metals export assurance