Every passage is a payment, once it is counted.
Count it at the gantry.
A toll road or a bridge is paid for by passages, so each passage must be counted once, signed at the gantry and reconciled to its payment. CFA Ventures develops, finances, builds and operates that record, and the concession that rests on it.
The stakes
Infrastructure waits on finance, and finance waits on a count it can trust
Where a road or a bridge pays for itself, no state guarantee is required. That holds only while the revenue is measured by someone other than the party that collects it.
Ranges as published, drawn to one scale from zero. Source: African Development Bank, African Economic Outlook 2018.USD 130bn to 170bnEstimated annual infrastructure investment needs of Africa.Source: African Development Bank, African Economic Outlook 2018. Open the publication ↗USD 68bn to 108bnEstimated annual infrastructure financing gap of Africa.Source: African Development Bank, African Economic Outlook 2018. Open the publication ↗
Estimated annual infrastructure investment needs of Africa
African Development Bank, African Economic Outlook 2018
USD 130bn to 170bnEstimated annual infrastructure investment needs of Africa.Source: African Development Bank, African Economic Outlook 2018. Open the publication ↗Estimated annual infrastructure financing gap of Africa
African Development Bank, African Economic Outlook 2018
USD 68bn to 108bnEstimated annual infrastructure financing gap of Africa.Source: African Development Bank, African Economic Outlook 2018. Open the publication ↗A concession converts a road into a revenue stream. Lenders price the risk that the stream is mis-stated: passages not counted, a tariff mis-applied, money not reconciled. Remove that risk with independent evidence and the same road is easier to finance.
Mechanism
A passage can go missing in four places, and each has its own control
Choose the place and read the control. The sizer then puts an illustrative price on a small leak.
Passage gap sizer
Illustrative inputs- Stage 1Lane sensorThe vehicle is read and an event is written.
- Stage 2ClassificationThe event is given a class and a tariff.
- Stage 3PaymentThe passage is matched to its payment.
- Stage 4LedgerThe record is sealed and settled.
- Missing each day
- 600
- Kept on the record
- 19,400
- Revenue off the record, a year
- 438,000illustrative units: passages missing, times the toll, times 365 days
Inputs are illustrative and editable. The sizer multiplies; it states no real traffic, tariff or loss.
What the firm builds
One model carries a corridor from study to hand-back
The three slabs of the mark are the three phases. Each is delivered by the same firm, so the party that studies the road also answers for counting it.
Develop
- Traffic and revenue study from public data, with an evidence register in which every figure has a grade and a source
- Pre-feasibility and feasibility, business plan and open-book financial model
- Concession and PPP structuring, financing from equity to local-currency debt
Build
- Tolling systems, traffic counting and gantry instrumentation, signed at the edge
- Integration with existing state systems through documented, revocable interfaces
- Installation management and acceptance gates before the first fee
Operate
- Operations centre, field crews, maintenance and calibration on schedule
- Independent verification and service-level reporting the owner can read directly
- Training academy and the free hand-back of assets, code and skills
One unit
One passage becomes one sealed record in five steps
Follow a single simulated vehicle. The record on the right fills as it moves.
Step 1 of 5
The gantry writes one signed event
The vehicle crosses and two sensors read it. The device signs the event at the moment of creation with a key bound to that device, and adds the time and the lane. A record that fails its signature or its sequence number is rejected at the centre.
Step 2 of 5
A dated rule gives it a class and a tariff
The class comes from the recorded measurements. Each tariff lives once, in a rules module, with a date, an approver and a reference case that must pass before a new version takes effect. No algorithm approves an adjustment.
Step 3 of 5
The event identifier finds its payment
One identifier joins the passage to its payment. A passage with no payment, or a payment with no passage, opens an exception case routed to a named public owner. Duplicate candidates are held, never merged.
Step 4 of 5
The fee falls in the order the contract sets
The State share is paid first, from an escrowed collection account in which the operator is not a signatory. The performance reserve and the operator follow. The record earns a fee only when it is complete.
Step 5 of 5
The record is sealed and cannot be rewritten
It is written to an append-only store and chained by hash to the record before it. A correction is a new signed event with a reason and a second approver. The day is sealed, and anyone can verify that nothing changed.
Financing and delivery
Each risk is held by the party that controls it
Concession terms commonly run 15 to 20 years. That range is illustrative, and so is the shape drawn below.
Illustrative Relative lengths of the phases, not a forecast. Preparation before the effective date is carried by the developer, which is why delivery after it can be quick.
Risk allocation
Illustrative structureStandards
Designed against open standards, certified only where the certificate exists
Standards listed here are the ones the design is written against. None is claimed as a certification.
Universal financial industry message scheme.
Designed against: payment messages between collection accounts and banks.
OpenAPI Specification for describing HTTP interfaces.
Designed against: published interfaces that each calling institution manages.
Security for industrial automation and control systems.
Designed against: security of roadside control equipment and its zones.
Information security management systems: requirements.
Designed against: the security management system around the ledger.
Web Authentication: phishing-resistant sign-in with public-key credentials.
Designed against: phishing-resistant sign-in for every named account.
Next
From the corridor to the contract
Three places to continue, from a worked structure to the instrument that tests it.
A toll-road concession
An illustrative traffic ramp, revenue bands and a payback marker. It describes no client and no engagement.
Open→ServiceConcessions and PPP
Each unit of fee falls first to the State share, then to the performance reserve and the operator.
Open→InstrumentConcession waterfall
Move one fee through the State share, the performance reserve, the auditor and the operator.